BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a library in Glen Carbon, Illinois. Completed plans call for the renovation of a library.

The scope of this project includes, but is not limited to, the following: renovation of a library development. As of June 17, 2024, a general contractor has not yet been selected for this project. A firm construction timeline for this project has not yet been released. Location- 198 S. Main Glen Carbon, IL 62034 Summary Project Description: The project consists of the removal of the existing membrane and selective areas of metal roofing, insulation removal then replacement of the insulation and roofing. Removal and replacement of damaged insulation, membrane roofing replacement and replacement of an area of metal roofing and insulation The Owner has elected to request the work be completed by November 1st , 2024. 1. The Owner has elected to extend the deadline for receiving pre-qualification forms to 06.27.2024 at 5:00 pm. 2. The Owner has elected to eliminate the requirement to salvage coping for reinstallation. All coping tis to be replaced with new coping to match existing. 3. The Owner has elected to revise the base bid roof requirement to 60 mil white EPDM roofing system with 25- year details for a 25-year warranty. 4. The Owner has elected to have Kane Mechanical (GCCL's mechanical contractor) raise the gas piping 4", under separate contract with GCCL. 5. The Owner has elected to replace the short downspouts from the standing seam gable roof instead of shortening them. There are a total of 6 downspouts Inquiries: All questions are to be addressed to Eric Bratzler via the following email: eric@hendersonarchitects.com

Award

Library

$129,950.00

Public - City

Renovation

5

5

2

3

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
191
Active Projects
108
Bidding Soon
1,503
All Active Projects
645
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 2, 2024

August 1, 2024

November 1, 2024

img_map_placeholder

198 S Main St, Glen Carbon, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.