BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Miami, Florida. Completed plans call for site work for a water / sewer project.

**As of October 02, 2024, the award amount is $4,400,115.95. The types of contracts available under the MCC Program are construction projects, facility repairs, neighborhood improvements, emergency repairs and maintenance work with a maximum value of $5.0M; ORD 09-101. All capital departments are participating. Additional opportunities are available through Weatherization Assistance Program (WAP) which enables low-income families to reduce their energy bills by making their homes more energy efficient. Funds are used to improve the energy performance of dwellings by families in need, using the most advanced technologies and testing procedures available in the housing industry. Measures to make homes more energy efficient include: replacement or installation of key components, installation of energy recovery ventilation systems including bathroom and kitchen exhaust fans and installation of whole mechanical exhaust systems to provide better indoor air quality, install attic insulation, install window solar films, repair or replace inefficient cooling units, repair or replace water heaters and address air infiltration with weather stripping, caulking thresholds, minor wall repairs, ceiling and floors, windows and doors. License Requirements - At the time of Bid and pursuant to the requirements of Section 10-3 of the Code of Miami-Dade County, Florida and Request for Price Quotation (RPQ) and Contract Documents, the Bidder and all its subcontractor must hold a valid, current, and active State and/or Miami-Dade County contractor's license consistent with the requirements of the Scope of Work. 3) Regulatory and Economic Resources - Mario Lopez Telephone No.: (305) 372-6556. RPQ No: DRM-LRB1C-2024- Little River C-7 Basin Improvements Phase I C ESTIMATED COST: $4,211,631.20 LICENSE REQUIREMENT: General Building contractor, General Engineering SCOPE OF WORK: The Little River (C-7) Basin Improvements Phase I Project Scope of Work for this contract consists of furnishing all supervision, labor, materials, tools, equipment and performing all operations required to construct the work in accordance with the contract documents. The County maintains approximately 168 miles of secondary canals which discharge into the South Florida Water Management District's primary canal system. Canals that have eroded have a reduced capacity less than the original design. Improvements include raising top of bank elevations (enhance storage), removal of bottom sediment, filter fabric placement, upgrading culverts (enhance conveyance) and improving outfalls. Future conditions in a 2060 scenario with sea level rise have been used as a design criteria. This project includes survey, soil testing, design, permitting, construction and construction management. The work shall include removal of any vegetation, excavation of the top soil, installation of woven geotextile filter fabric, installation of bedding/rip-rap for rebuilding of the bank in accordance with these specifications and/or as directed by the Engineer. The contractor will provide copies of all receipts and weight tickets (in TONS) from the disposal site. In addition, Contractor will provide photos of the loaded trucks prior to the transport of debris/materials corresponding to its weight ticket/receipt from the approved disposal site. Temporary on-site staging of materials within the canal right-of-way may be allowed so long as it does not create a hazardous condition and upon prior approval by the Engineer. Any questions regarding interpretation or clarification to project shall be submitted via email to Mario.Lopez2@miamidade.gov, Jess.Humyn@miamidade.gov, and Rocio.Soto@miamidade.gov with a copy to Clerk.Board@miamidade.gov. Goals and timetables for minority participation: Goal (percent) 39.5 Goals and timetables for the utilization of women: Goal (percent) 6.9

Award

Water / Sewer

$4,400,116.00

Public - County

Site Work

3

9

4

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
122
Active Projects
64
Bidding Soon
1,106
All Active Projects
432
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 7, 2024

October 7, 2024

img_map_placeholder

To Be Determined, Miami, FL


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.