EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 14, 2024 at 8:00 PM

Updated October 1, 2024

Site work and new construction of a municipal facility in Harrisburg, Pennsylvania. Conceptual plans call for the construction of a municipal facility; and for site work for a municipal facility.

The scope of work includes, but is not limited to surveying, investigating, and evaluating options for a new SOC with a Study, and then when an option is selected to move to design and construction. The intent of the study is to identify multiple options available to PEMA for design and construction of a Special Operations Center (SOC) collocated near the current HQ building on Elmerton Avenue in Harrisburg. The study will perform due diligence and provide advantages and disadvantages of multiple options. The budget and schedule of the SOC design and construction project will be validated as part of the study. When the budget is determined and validated, the budget will need to be used to obtain legislation to fund the design and construction of the project. Following the conclusion of the study, the Department intends to continue directly into the design phase of improvement project(s). The Department may retain the same professional who will perform this study. Subsequent improvement project(s) will include Small Diverse Business (SDB) and Veteran Business Enterprise (VBE) participation requirements & will be established by the Department following the study conclusion. The Professional is encouraged to retain SDB/VBE consultants who can continue into the design phase. The Goals for SDB participation: 0% The Goals for VBE participation: 0% Municipal meeting description: The Professional Selections Meeting can be joined online at this link: Professional Selections Web Conference Phone Conference ID: 464 364 517# Toll-free: 1 267-332-8737 The method of Contractor Selection has not been Determined at this time.

Conceptual

Municipal

$60,000.00

Public - State/Provincial

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

13

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Storage Specialties, Storage Assemblies
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Lighting, Exterior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Fill, Backfill, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Site Improvements, Retaining Walls, Planting

Find More Local Projects

Within 75 Miles of This Project
158
Active Projects
93
Bidding Soon
1,273
All Active Projects
607
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 16, 2025

img_map_placeholder

Bamberger Rd, Harrisburg, PA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

RFP Design - PEMA Headquarters - Special Operations Center (SOC) - New Construction

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.