EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 3, 2024 at 8:00 PM

Updated October 4, 2024

Site work for a water / sewer project in Miami, Florida. Completed plans call for site work for a water / sewer project.

**As of October 02, 2024, the award amount is $3,366,424.86. The types of contracts available under the MCC Program are construction projects, facility repairs, neighborhood improvements, emergency repairs and maintenance work with a maximum value of $5.0M; ORD 09-101. All capital departments are participating. Additional opportunities are available through Weatherization Assistance Program (WAP) which enables low-income families to reduce their energy bills by making their homes more energy efficient. Funds are used to improve the energy performance of dwellings by families in need, using the most advanced technologies and testing procedures available in the housing industry. Measures to make homes more energy efficient include: replacement or installation of key components, installation of energy recovery ventilation systems including bathroom and kitchen exhaust fans and installation of whole mechanical exhaust systems to provide better indoor air quality, install attic insulation, install window solar films, repair or replace inefficient cooling units, repair or replace water heaters and address air infiltration with weather stripping, caulking thresholds, minor wall repairs, ceiling and floors, windows and doors. License Requirements - At the time of Bid and pursuant to the requirements of Section 10-3 of the Code of Miami-Dade County, Florida and Request for Price Quotation (RPQ) and Contract Documents, the Bidder and all its subcontractor must hold a valid, current, and active State and/or Miami-Dade County contractor's license consistent with the requirements of the Scope of Work. Little River C-7 Basin Improvements Phase II C ESTIMATED COST: $3,170,364.96 LICENSE REQUIREMENT: General Building Contractor, General Engineering SCOPE OF WORK: The Little River (C-7) Basin Improvements Phase II Project Scope of Work for this contract consists of furnishing all supervision, labor, materials, tools, equipment and performing all operations required to construct the work in accordance with the contract documents. The County maintains approximately 168 miles of secondary canals which discharge into the South Florida Water Management District's primary canal system. Canals that have eroded have a reduced capacity less than the original design. Improvements include raising top of bank elevations (enhance storage), removal of bottom sediment, filter fabric placement, upgrading culverts (enhance conveyance) and improving outfalls. Future conditions in a 2060 scenario with sea level rise have been used as a design criteria. This project includes survey, soil testing, design, permitting, construction and construction management. The work shall include removal of any vegetation, excavation of the top soil, installation of woven geotextile filter fabric, installation of bedding/rip-rap for rebuilding of the bank in accordance with these specifications and/or as directed by the Engineer. The contractor will provide copies of all receipts and weight tickets (in TONS) from the disposal site. In addition, Contractor will provide photos of the loaded trucks prior to the transport of debris/materials corresponding to its weight ticket/receipt from the approved disposal site. Temporary on-site staging of materials within the canal right-of-way may be allowed so long as it does not create a hazardous condition and upon prior approval by the Engineer. Any questions regarding interpretation or clarification to project shall be submitted via email to Mario.Lopez2@miamidade.gov, Jess.Humyn@miamidade.gov, and Rocio.Soto@miamidade.gov with a copy to Clerk.Board@miamidade.gov. Goals and timetables for minority participation: Goal (percent) 39.5 Goals and timetables for the utilization of women: Goal (percent) 6.9

Award

Water / Sewer

$3,366,425.00

Public - County

Site Work

3

9

4

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Scaffolding
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation, Fill, Embankments, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
99
Active Projects
37
Bidding Soon
1,086
All Active Projects
402
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 14, 2024

October 14, 2024

img_map_placeholder

To Be Determined, Miami, FL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.