BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a bridge / tunnel in Byers, Colorado. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Region: 1 Counties: Logan Morgan Weld Contract UDBE Goal: 13.00 % Work Days: 1854 Bridge Preventative Maintenance project on seven structures along I-76 & I-225 within Adams and Arapahoe counties. The project consists of removal and replacement of expansion joints on five structures. Polyester concrete overlay on two structures. It also includes concrete pavement work, joint sealant and minor guardrail repairs. This project is located in Region 2 in various locations. Project work consists of bridge preventative maintenance along I-76 & I-225. Please contact Nyssa Beach at 303-365-7278 for all project related questions. It is estimated that the total cost of all items in the bid will be: ( ) Between $0 and $1,000,000 ( ) Between $1,000,000 and $5,000,000 (X) Between $5,000,000 and $20,000,000 ( ) Greater than $20,000,000 CO DOT: 002 - Region 2 - Bridge Preventative Maintenance on I-76 & I-225 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Bridges / Tunnels

$7,438,813.00

Public - State/Provincial

Paving, Site Work

89

4

7

Subscribe For Documents

50 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
102
Active Projects
67
Bidding Soon
950
All Active Projects
405
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 11, 2024

September 9, 2024

img_map_placeholder

Multiple Locations, Byers, CO

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.