BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 13, 2026 at 7:00 PM

Updated May 21, 2026

Site work and paving for a bridge / tunnel in Byers, Colorado. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

**As of August 5th, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** Reference Number 0000386587 Bid Intent Not Available Question Deadline 05/19/2025 at 2:00 PM MT The CR38 bridge over Middle Bijou Creek experienced significant abutment protection loss, pier scour, low flow channel damage, and stream bed scour from a significant flood in the Summer of 2023. Bridge protection, low flow channel restoration and stream bed protection will be made to pre-flood conditions. Buyer Preferences, Guidelines & Requirements General Requirements - Bid Deposit Required - Insurance Required ch Bid must be accompanied, in a sealed envelope separate from the one containing the Bid, by a bid bond on an approved form in the amount equal to ten percent (10%) of the Bid price, made payable to Arapahoe County, Colorado which shall be considered as liquidated damages and shall be forfeited to the County if said Bid is accepted and the Bidder fails to execute the Contract within 10 calendar days after the acceptance of the Contractor's Bid by the County. Arapahoe County reserves the right to reject all or part of all Bids, to waive any informalities or irregularities therein.

Award

Bridges / Tunnels

$838,266.00

Public - County

Paving, Site Work

31

7

4

8

Subscribe For Documents

140 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
274
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 5, 2025

July 7, 2025

Project location map

Co Rd 38, Byers, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.