Published September 12, 2025 at 8:00 PM
Updated September 13, 2025
Site work for a water / sewer project in Byers, Colorado. Completed plans call for site work for a water / sewer project.
Region: 1 Contract ID: C26065 Counties: Adams Guaranty: 5% of Total Bid Contract UDBE Goal: 12.00 % Work Days: 30 I-70 and Pena Blvd Overpass This project is located in Region 1 in Adams County. Project work consists of drainage improvements at the I-70 and Peña Blvd Overpass. Please contact Katie Dawson at 303-398-6738 for all project related questions. CODOT: 002 - Region 1 - Drainage Improvements This work consists of providing Public Information Management for the duration of the project. The Contractor shall submit all documentation associated with the Public Information Management item to the Project Engineer. Before approval, the Engineer will coordinate review and approval with the Region Communications Manager (RCM). Anticipated communications issues on this project include: o Coordination with DEN to ensure closures do not conflict This work consists of furnishing a uniformed police agency officer to perform uniformed traffic control. The Contractor shall ensure the selected uniformed traffic control agency meets federal, state, and local requirements for uniformed traffic control. When called for in the Contract, this work includes furnishing a vehicle for the officer to use in performing uniformed traffic control. This special provision contains the Department's estimate for force account items included in the Contract. The estimated amounts marked with an asterisk will be added to the total bid to determine the amount of the performance and payment bonds. Force Account work shall be performed as directed by the Engineer. F/A Minor Contract Revisions - Consists of minor work authorized and approved by the Engineer, which is not included in the contract plans or specifications, and is necessary to accomplish the scope of work of this contract. This work consists of salvaging topsoil from onsite locations, stockpiling, maintaining, and preparing the subsoils for the placement of the topsoil at locations shown on the plans. It also includes creating seeding media by amending subsoils, and importing offsite topsoil when shown on the plans. Substitutions from this specification will not be allowed unless submitted in writing to the Engineer and approved by the Region or Headquarters Landscape Architect. This work consists of constructing, installing, maintaining, and removing when required, control measures during the life of the Contract to prevent or minimize erosion, sedimentation, and pollution of any State waters as defined Section 101. Stormwater runoff from all disturbed areas and soil storage areas for which permanent or interim stabilization is not implemented, must flow to at least one control measure to minimize sediment in the discharge. This shall be accomplished through filtering, settling, or straining. The control measure shall be selected, designed, installed, and adequately sized in accordance with good engineering, hydrologic, and pollution control practices. The control measures shall contain or filter flows in order to prevent the bypass of flows without treatment and shall be appropriate for stormwater runoff from disturbed areas and for the expected flow rate, duration, and flow conditions (i.e., sheet or concentrated flow). The Contractor shall coordinate the construction of temporary control measures with the construction of permanent control measures to assure economical, effective, and continuous erosion and sediment control throughout the construction period. When a provision of Section 208 or an order by the Engineer requires that an action be immediate or taken immediately, it shall be understood that the Contractor shall at once begin affecting completion of the action and pursue it to completion in a manner acceptable to the Engineer. MBE (13.8%), WBE (6.9%), DBE (12%)
Award
Water / Sewer
$818,182.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 14, 2025
September 15, 2025
Multiple Locations, Byers, CO
Related To This Project
Byers, CO
Bid Date: Oct 23 2025
Byers, CO
Bid Date: Dec 04 2025
Byers, CO
Bid Date: Jun 05 2025
Byers, CO
Bid Date: Mar 27 2025
Byers, CO
Bid Date: Feb 06 2025
Byers, CO
--
Byers, CO
--
Byers, CO
Bid Date: Sep 26 2024
Byers, CO
Bid Date: Jul 11 2024
Byers, CO
Bid Date: Jun 06 2024
Byers, CO
--
Byers, CO
Bid Date: Dec 07 2023
Byers, CO
Bid Date: Mar 09 2022
Byers, CO
Bid Date: Feb 22 2022
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.