BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and outdoor lighting for a mixed-use development in Miami, Florida. Completed plans call for the demolition of a municipal facility; for site work for a municipal facility; for outdoor lighting for a municipal facility; sidewalk / parking lot; for paving for a sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

POM ILA Office Trailers Estimated Cost: $591,152.00 License Requirement: General Building Contractor, General Engineering, Underground Utility/ Excavation Question Deadline: 07/03/2024 at 12:00 PM ET , All Requests for Clarification of a Rpq Must Be Submitted in Writing Written Communications Must Be in the Form of E-mail Addressed to Frank Ramirez at Sprfi@miamidade.gov With a Copy to the Clerk of the Board at Clerkbcc@miamidade.gov and a Copy to Clarissa.pereira@miamidade.gov. Scope of Work: Additional Subcontractor Licenses Are as Follows: *mechanical *low Voltage *fire Protection *it/telecommunications The Work of This Contract Comprises the General Construction Required for the Construction of the Following Scope: 1- Demolition and Site Preparation of Existing Conditions, Based on Conditions Assessments Such a Drainage, Striping, Traffic, Signage, Etc. 2 - New Parking Lot Layout and Striping in Area Immediately Surrounding Mobile Trailers. 3 - New Site Lighting Fixtures, Mounted to Exterior of Mobile Trailers Wall Structure. 4 - New Electrical, Sanitary, Water, at&t, and Communication Utilities. 5 - Coordination With Trailer Vendor.

Post-Bid

Water / Sewer

$591,152.00

Public - County

Demolition, Outdoor Lighting, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
116
Active Projects
47
Bidding Soon
1,097
All Active Projects
488
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 16, 2024

August 16, 2024

img_map_placeholder

1015 N America Wy, Miami, FL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.