EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 16, 2024 at 8:00 PM

Updated October 1, 2024

Site work and paving for a road / highway in Moorestown, New Jersey. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The Work Includes The Furnishing Of All Labor, Material, And Equipment Necessary Or Required To Complete All Work Set Forth In The Specifications And Shown On The Plans For The Construction Of The Flynn Avenue Improvements Located In The Township Of Moorestown, New Jersey, Including But Not Limited To Pavement Milling (Minimum 2" Thick), Surface Course (9.5m64, 2" Thick), Replacement Of Concrete Curb, Traffic Striping, And Inlet Head And Grate Replacement. Bids Must Be Made On The Standard Proposal Form In The Manner Designated Therein, Providing One (1) Original And One (1) Copy, And Must Be Enclosed In A Sealed Envelope Bearing The Name And Address Of The Bidder And The Name Of The Project On The Outside, Addressed To Moorestown Township, And Must Be Accompanied By A Certified Check, Bid Bond Or Cashier's Check Drawn To The Order Of Moorestown Township For Ten Percent (10%) Of The Total Amount Bid, Provided Said Security Not Be More Than $20,000.00. All Bid Guarantees Shall Be Accompanied By An Executed Consent From An Approved Surety Company, Licensed To Conduct Business In The State Of New Jersey, Agreeing To Furnish The Required Performance, Payment And Maintenance Bond Upon The Award Of Contract. The Signed Proposal Forms And Bid Security Must Be Delivered To The Place On Or Before The Hour Named Above. The Accepted Bidder Must Sign The Contract Within Ten (10) Days After The Notice Of Award Or Forfeit His Bid Security. Bid Securities Will Be Returned To All But The Three Apparent Lowest Responsible Bidders. All Other Bid Securities Will Be Returned After Awarding And Signing Of The Contract And Approval Of The Contractor's Performance Bond. Bidders Are Required To Comply With The Requirements Of N.j.s.a 10:5-31 Et Seq. And N.j.a.c. 17:27. (Affirmative Action Law); N.j.s.a. 52:32-44 (Business Registration Act); And N.j.s.a. 34:11-56.48 Et Seq. (Public Works Contractor Registration Act). In Accordance With P.l. 2021, C. 301, A Contractor Submitting The Lowest Bid For A Contract That Is Subject To The Prevailing Wage Act, If That Bid Is 10 Percent Or More Lower Than The Next Lowest Bid, Shall Certify To The Public Body That The Prevailing Wage Rates Required By The Act Shall Be Paid. The Right Is Reserved To Reject Any Or All Proposals, In Whole Or In Part, Or To Make Awards To Such Bidder Or Bidders, Who, In The Judgment Of The Township Of Moorestown Makes The Most Advantageous Bid And To Waive Such Informalities As May Be Permitted By Law. Document Notes :The Electronic Copy Of The Bid Documents Is Available Via Email. Digital Copies Of The Bid Documents Will Be Provided And May Be Obtained At No Cost By Contacting Pennoni Associates, By E-mail At Aborstad@pennoni.com With A Cc To Ddownes@pennoni.com. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com. Notice to Proceed will be issued effective no later than September 1

Award

Roads / Highways

$389,314.00

Public - City

Paving, Site Work

14

19

2

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Closeout Procedures, Closeout Submittals, Maintenance Data, Warranties, Project Record Documents, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Precast Concrete, Precast Structural Concrete
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Tiling, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 27 - Communications

Division 27 - Communications

Communications
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Finish Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Pruning, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Site Improvements, Fences and Gates, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Storm Drainage Utilities, Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
459
Active Projects
256
Bidding Soon
4,181
All Active Projects
1,988
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 2, 2024

September 1, 2024

img_map_placeholder

Multiple Locations, Moorestown, NJ

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

FY2024 NJDOT MA - Flynn Avenue, Harper Drive, and Nixon Drive Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.