BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Rancho Cucamonga, California. Completed plans call for the renovation of a municipal facility.

Contractor to install cubicles for the Dr. Bradley P. Gilbert Center for Learning & Innovation located at 9500 Cleveland Avenue, Rancho Cucamonga, CA 91730 Question Deadline 06/26/2024 at 2:00 PM PT Deadline for Submission of Questions: Post all questions online. ESTIMATED PROJECT COST: $2,900,000 Provide and install 529 new STEELCASE ANSWER PANEL SYSTEMS CUBICLES on the 3rd Floor of the Dr. Bradley P. Gilbert Center for Learning & Innovation ("9500 Building") in accordance with the Architectural Drawings. The total area is 85,000 sq. ft.). The job is located at 9500 Cleveland Avenue, Rancho Cucamonga, CA 91730. This area will be used as a business office and will consist of open work areas with cubicles, conference rooms, private offices, print and data rooms, collaborative areas, restrooms, reception area, and storage rooms. The demolition of previous cubicles has been completed. i. All work shall be performed by a licensed Contractor in accordance with the Architectural Drawings. ii. In the event of a discrepancy between the Scope of Work and the Architectural Drawings, the Architectural Drawings will take precedence. iii. Contractor is responsible for building permits, if needed. iv. Contractor is responsible for electrical and data connections run through cubicle system poles from service drops in the ceiling. v. Contractor shall provide and install 529 STEELCASE ANSWER PANEL SYSTEMS CUBICLES, in IEHP-standard sizes in the locations shown on the Architectural Drawings, to include: a) 10" x 10" Manager Cubicles: Quantity of 20 b) 6' x 10' Supervisor Cubicles: Quantity of 22 c) 6' x 6' General Staff Cubicles: Quantity of 487

Post-Bid

Municipal

$2,900,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
493
Active Projects
246
Bidding Soon
3,689
All Active Projects
1,597
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 3, 2024

September 2, 2024

November 1, 2024

img_map_placeholder

9500 Cleveland Ave, Rancho Cucamonga, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.