BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a residential development in Waterloo, New York. Completed plans call for the renovation of a residential development.

Final Date for Receipt of Questions: October 25, 2024 Official Responses to Questions by: October 29, 2024 Contract term: 30 days after completion of project The Design Vendor shall provide all labor and materials necessary to complete a fully comprehensive drawing design and specification generation of the services required in a professional manner. Refer to the attached specifications (if applicable) for the following OPWDD Requirements of the Project Scope of Work. All projects are subject to Environmental Surveying, which shall be conducted outside this Scope of Work and shall be completed before work commences on all properties. Design Services: 1. Reference attached specific OPWDD Requirements (if applicable) of the Renovations/Replacements being designed. (eg: Kitchen, Bathroom, Roof, FACP, Generator, Sidewalks, Windows, Abatement, etc.) 2. Drawing Designs and Specifications are to be in accordance with: a. 14 NYCRR 635, Subpart 635-7 b. 19 NYCRR 1201 and 1204. c. OPWDD Specifications, d. NFPA (NFPA 101 - Life Safety Code) e. NYS Uniform Building Code, f. NYS Environmental and Energy Code Regulation Compliance. g. NFPA 101A - Guide on Alternative Approaches to Life Safety. 3. Product Specification Data. a. Construction details, material descriptions, dimensions, profiles, finishes, and applicable schematics, and cut sheets. 4. All Design and Specification documents shall be provided on Adobe (.pdf), CAD Files should be provided to OPWDD for future use and records. 5. Document Submissions to be provided to OPWDD Point of Contact (POC) at routine Intervals: a. 90% Completion (Issued for Permitting- signed and stamped), b. 100% Completion 6. Internal Construction Permitting to be completed by the Maintenance Supervisor with necessary OPWDD Agency Personnel in Central Office The vendor shall provide all labor and materials necessary to complete the work in a professional manner according to scope of work and architectural drawings if supplied. Work is to be started within 120 days of award. This is a NYS Public Works project and prevailing wages are to be paid. Site must be cleaned and all materials secured at the end of each work day. Absolutely no scraps, especially fasteners, are to be left unsecured. No debris will remain on site. The contractor will remove all debris. Subcontractors will be pre-approved by the project manager as well as the business office and will be made aware of this scope of work. Scheduled inspections will be conducted or subsequent work may be removed and destroyed in it's entirety. The residential code of NYS will be followed. Continuity of work: Once the job has begun it will be worked on continuously until completion. This home will be occupied during this work and safe appropriate accessibility will be maintained. The safety plan will be followed. Upon completion of the Upstairs Bathroom Renovation, before removal of equipment, contractor is to schedule a quality control and quality assurance inspection with the point of contact. If any condition of this scope is neglected the project may be terminated immediately

Bid Results

Residential Subdivision

$46,666.00

Public - State/Provincial

Renovation

6

3

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
158
Active Projects
70
Bidding Soon
951
All Active Projects
539
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 31, 2024

December 2, 2024

img_map_placeholder

1545 N Rd, Waterloo, NY

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.