BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 29, 2024 at 8:00 PM

Updated July 30, 2024

Site work and paving for a road / highway in Spirit, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Meier Road Improvement Project 200 TONS Base Aggregate Dense 3/4" 220 TONS Medium rip-rap 160 Lin, Ft. 30" Dia. I-IDPE Culverts This project is being funded in part with the Town Road Improvement Program (TRIP). Each bid shall be accompanied by a Bid Guarantee in the form of a Certified Check in the amount of five (5) percent of the bid price payable to the Town of Spirit as a guarantee that if the bid is accepted the bidder will execute and file the proper contract within the time set or the bid deposit shall be forfeited as liquidated damages. Project to be completed by October 15, 2024. The successful bidder shall be required to furnish a Certificate of Insurance, together with an executed contract. The Town reserves the right to reject any or all bids and accept the bids deemed or to accept any bid they deem in the best interests of the Town of Spirit. The contractor shall be pre-qualified by the Wisconsin Department of Transportation to perform the work in this bid or proof of responsibility may be required.

Award

Roads / Highways

$21,280.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
76
Active Projects
44
Bidding Soon
290
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 9, 2024

August 8, 2024

Project location map

Meier Rd, Spirit, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.