BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Auburn, Nebraska. Completed plans call for site work for a residential development; for paving for a residential development; and water / sewer project.

A pre-bid conference will not be conducted for this Project. Project Category Code: Street/Road Intersection Improvements, Street/Road Intersection Construction and Repair, Traffic Control Devices (Signals, Signing, etc.), Storm Drain and Paving, Water Infrastructure (Water Meters), Sewer and Water Construction, Erosion Control/Slope, Bank Stabilization, Sitework/Excavating and Grading, Grade and Surface, Street/Road Repairs, Water/Wastewater Infrastructure, Stormwater Improvements, Erosion Control - Temporary, Street/Road Concrete Reconstruction, Paving (Highway, Road or Street) Description: A proposed residential development consisting of overall mass grading and new construction of sanitary sewer, water main, storm sewer and pavement SCOPE OF WORK: A. The work in this Section includes site dewatering necessary to lower and control groundwater level and hydrostatic pressure, and controlling the site drainage and surface water flows, to allow construction to be performed. 1. It is required that the groundwater level be lowered and maintained at the level necessary to provide a substantially dry and stable grade to allow subsequent operations to be performed. 2. The Contractor shall install all such dewatering equipment as may be necessary, throughout the duration of the project, to maintain the groundwater level, as required. 3. Contractor is responsible for controlling discharge rate and the dewatering systems effect on the groundwater level. 4. The Contractor shall intercept and divert site drainage and surface water flows away from excavations and trenches; using dikes, ditches, pipes, sumps, pumps or other means. 5. The Contractor shall remove standing water from trench or excavation with sumps, pumps and piping or other means. B. It shall be Contractors responsibility to select materials, methods, and equipment, and design a dewatering system which will- 1. Provide a substantially dry and stable grade to allow subsequent operations to be performed. 2. Effectively reduce the hydrostatic pressure and lower the groundwater level, as required. 3. Not result in damage to adjacent properties, buildings, structures, utilities, private and public water wells, or other work, as a result of settlement, standing water or other groundwater-related effects. C. Dewatering operations shall be adequate to assure the integrity of the finished project. D. The responsibility for conducting the dewatering operation in a manner, which will protect adjacent structures and facilities, rests solely with Contractor. 1. The cost of repairing any damage and/or the restoration or replacement of adjacent structures and facilities that are damaged as a result of the dewatering operations shall be the sole responsibility of Contractor. E. The Contractor shall be solely responsible for the design, installation, operation, maintenance, monitoring, and removal of the dewatering system. Copies ofthe contract documents are on file with the City of Auburn, Nebraska for examination by bidders. Complete digital project bidding documents are available at JEOs website at jeo.com for $30. An optional paper set of project documents is available for a non-refundable price of $100 per set.

Bid Results

Residential Subdivision

$2,781,908.00

Public - City

Paving, Site Work

49

22

11

5

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
57
Active Projects
29
Bidding Soon
586
All Active Projects
219
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 2, 2024

September 2, 2024

img_map_placeholder

To Be Determined, Auburn, NE

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.