BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 24, 2025 at 8:00 PM

Updated April 25, 2025

Renovation of a mixed-use development in Scooba, Mississippi. Completed plans call for the renovation of a educational facility.

1. The complete demolition and removal of the existing floor and installation of Robbins BioChannel Star floor system OR Equivalent. Bleachers will have to be removed and reinstalled as part of the bid. Flooring installer will also be responsible for determining, in coordination, with the EMCC IT and Maintenance departments, where they will run conduit under the new flooring to provide power and data to the scorer's table on the sideline. 2. Inspection of existing slab to verify if there is a need for the possible installation of a concrete topping and moisture barrier over the existing concrete slab or surface. A. MFMA - Maple Flooring Manufacturers Association B. MFMA PUR - Performance Uniformity Requirements C. DIN 108032 (part 2) 2001 - Performance Test D. DIN 108032 (part 2) 1991 - Performance Test E. ASTM F2772 - Athletic Performance Properties of Indoor Sports Floor Systems F. EN 14904 - European Committee for Standardization - Surfaces for Sports areas G. ASTM F2772 - Athletic Performance Properties of Indoor Sports Floor Systems H. FIBA - International Basketball Federation I. FSC - Forest Stewardship Council A. Contractor is responsible for ensuring the slab is clean and free of all dirt and debris prior to floor installation beginning. B. Permanent heat, light and ventilation shall be installed and operating during and after installation. Maintain a temperature range of 55 to 80 degrees Fahrenheit (13 to 27 degrees Celsius) and a relative humidity range of 35 to 50%. Consult MFMA guidelines for further information. C. After floors are finished, area to be kept locked by owner to allow curing time for the finish. If after required curing time owner requires use of gym, he shall protect the floor by covering with non-fibered kraft paper or red rosin paper with taped joints, until acceptance by owner (or owner's agent) of complete gymnasium floor. INSTALLATION A. VAPOR BARRIER 1. Install polyethylene with joints lapped a minimum of 6" (150mm) and turned up 4" (100mm) at the walls. B. SUBFLOOR 1. Install shock absorbing pad per manufacturer's recommendations over 6 mil poly. 2. Following manufacturer's guidelines, place plywood panels, as defined in section 2.01, subfloor assembly in end-to-end manner, staggering end joints in adjacent rows. Allow for a 1/4 " (6mm) gap between panels. Panels shall be placed on a 45-degree angle to the direction of the maple flooring. Provide 1- 1/2 " to 2" (40 to 50mm) expansion void at the perimeter and all vertical obstructions. 3. Install solid blocking at doorways, under bleachers in the stacked position, and below portable goals.4. Install Bleacher Blocking per manufacturer's recommendations. 5. Place metal anchor channel in each factory-prepared location in the panel. 6. Anchor each anchor channel in the center pre-routed hole only, unless trimming at wall or vertical obstruction requires relocation in adjacent location to anchor. C. FLOORING 1. Machine nail maple finish flooring 10" to 12" (150mm to 200mm) O.C. with end joints properly driven up and proper spacing provided for humidity conditions in specific regions. Consult your local "Certified" contractor. Provide 2" (50mm) expansion voids at the perimeter and at all vertical obstructions.

Award

Educational

$229,546.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
48
Active Projects
19
Bidding Soon
314
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2025

April 4, 2025

Project location map

1512 Kemper St, Scooba, MS

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.