Site work for a civil project in Denison, Texas. Completed plans call for site work for a water / sewer project.

The Project includes the following Work: Installation of pre-purchased pumps, motors, valves, motor control center and switchgear Furnishing and installing a new 54-inch metal expansion joint, pipeline, and connection to the existing 84-inch Lake Texoma Pipeline Reconnecting two existing GTUA pumps to the new 54-inch metal expansion joint. Electrical and Instrumentation to support the new pumps, motor and pipeline. Estimate: $9.5 - $11 million *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Submit requests for alternate terms and conditions, approval of Work not in strict compliance with the Contract Documents, or requests to include products of Manufacturer's not listed as approved Manufacturers in a specification to the OPT no later than 10 days after the date the Project is first advertised by sending the request to Lewis Bernard, PE at Lewis.Bernard@freese.com. The Project includes the following Work: Installation of pre-purchased pumps, motors, valves, motor control center and switchgear Furnishing and installing a new 54-inch metal expansion joint, pipeline, and connection to the existing 84-inch Lake Texoma Pipeline Reconnecting two existing GTUA pumps to the new 54-inch metal expansion joint. Electrical and Instrumentation to support the new pumps, motor and pipeline. The Budget for the Project is $10,500,000. The Project is to be substantially complete and ready for operation within 470 days of the notice to proceed. Proposals with a substantial completion duration beyond this number of days will be considered non-responsive. The Project is to be completed and eligible for final payment 30 days after the date for Substantial Completion. Submit all questions about the meaning or intent of the Contract Documents, Addenda, and the related supplemental data to the OPT (Owner Project Team) using the Procurement Website indicated in the Request for Proposals. Responses will be posted on the Procurement Website for all planholders to read. For questions, please contact... SMITH PUMP COMPANY, INC. 301 M&B Industrial Waco, Texas 76712 Attention: Daniel Tacker Phone: 254.776.0377 Facsimile: 254.399.8274 E-mail: danielt@smithpump.com Question Deadline 07/04/2024 Submit all questions about the meaning or intent of the Contract Documents, Addenda, and the related supplemental data to the OPT (Owner Project Team) using the Procurement Website indicated in the Request for Proposals. Responses will be posted on the Procurement Website for all planholders to read. 5.02 All inquiries must be received no later than seven days prior to receipt of Proposals. A response may not be forthcoming if the inquiry or request is not submitted in time

Bid Results

Water / Sewer

$17,857,469.00

Public - City

Site Work

106

48

21

7

Subscribe For Documents

103 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
321
Active Projects
180
Bidding Soon
4,306
All Active Projects
1,667
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 19, 2024

September 17, 2024

January 30, 2026

img_map_placeholder

314 Hanna Dr, Denison, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.