Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 20, 2024 at 8:00 PM
Updated August 21, 2024
Site work and paving for a sidewalk / parking lot in Anna Maria, Florida. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
As of August 20,2024, project was awarded to Eason Builders Group, awarded amount is $233,704.73. https://www.amisun.com/2024/08/05/commissioners-propose-larger-tax-cut/ The capital plan proposes spending a total of $6.94 million on existing capital projects. Murphy’s capital plan proposes spending $250,000 on street and road paving and maintenance. That marks a significant decrease from the $673,000 budgeted for the current 2023-24 fiscal year that ends on Sept 30. Murphy said Anna Maria’s streets and roads have all been repaved in recent years and are in good shape, with no existing potholes that he’s aware of, but there’s still some pavement striping needed. “I get compliments on our roads,” Murphy said. The capital plan proposes spending $3.65 million for new Pine Avenue sidewalks, using money carried over from the current fiscal year. The sidewalk installations will be primarily funded by a state appropriation and some additional state and federal funds being carried over from the current fiscal year. Murphy said no ad valorem property tax revenues will be used to fund the sidewalk installations. The capital plan proposes spending $2.47 million for stormwater and drainage improvements and $525,235 for stormwater and drainage maintenance. _______________________________________________________________________________________________________ Furnish all necessary materials, equipment and labor to complete the proposed sidewalks and crosswalks on Pine Avenue from Gulf Drive to North Shore Drive. Last Date for Receipt of Written Questions: July 3, 2024 11:00 a.m. Est The City reserves the right to reject any or all proposals with or without cause; to waive any or all irregularities with regard to the specifications and to make the award to the Proposer offering the greatest advantage to the City. All bids must be sealed and will be rejected if received after the submission date and time. Intent of Contract: Bid forms shall set forth firm bid unit prices for furnishing all necessary materials and completing all work, including but not limited to labor, transportation, supervision, electricity, water, equipment, startup, testing, training, and all other work needed for a complete and operational system, as described in the Technical Specifications and/or shown on the Contract Drawings attached herewith. The City reserves the right to establish the exact limits of work in the field and to add or delete from the Project, as it deems necessary. The intent of the Technical Specifications and Contract Drawings, as applicable, is to describe a complete project to be constructed in accordance with the Contract Documents. The Contract Documents comprise the entire Agreement between the City and the Contractor. They may be altered only by addendum or change order approved by the City.
Award
Sidewalks / Parking Lot
$233,705.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 17, 2024
August 16, 2024
Pine Ave, Anna Maria, FL
Related To This Project
Anna Maria, FL
--
Anna Maria, FL
Bid Date: May 16 2025
Anna Maria, FL
Bid Date: Jun 02 2025
Anna Maria, FL
Bid Date: Jul 02 2025
Anna Maria, FL
--
Anna Maria, FL
Bid Date: Jul 23 2025
Anna Maria, FL
Bid Date: Jul 30 2025
Anna Maria, FL
Bid Date: Aug 13 2025
Anna Maria, FL
--
Anna Maria, FL
Bid Date: Dec 19 2017
Jacksonville, FL
Bid Date: Jul 24 2024
Eglin, FL
--
Miami, FL
Bid Date: Jul 17 2024
Jacksonville Beach, FL
Bid Date: Jul 10 2024
Unlock Your Potential with Access to Commercial Construction Data
Sign up now to get free company and project data. No payment required.
