BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and outdoor lighting for a mixed-use development in Miami Beach, Florida. Completed plans call for site work for a playground / park / athletic field; and for outdoor lighting for a playground / park / athletic field.

The objective of Phase 1C, the current phase of the Citywide Smart Street Lighting Project, is to upgrade approximately 1000 luminaires throughout Miami Beach. This phase aims to achieve the largest number of lighting improvements without the addition of new light pole infrastructure. A significant feature of this phase is the inclusion of City-approved Lighting Management System control nodes, enabling offsite monitoring and control of the lighting assets to improve City operations and maintenance. This phase builds upon continuous improvements across the City, where multiple fixtures, including those in City parks, parking lots, and neighborhoods, have already been upgraded to LED to address known deficiencies and enhance safety and operations. The current phase focuses on areas not yet updated to LED, with prioritization given to locations identified by the City based on the preliminary Citywide study conducted (Citelum Report), which pinpointed the lighting compliance and deficient areas throughout the City. For better understanding and organization, the City has divided this project into different neighborhoods, each with varying degrees of priority for lighting upgrades (see areas identified for improvement in the attached plans). The identified neighborhoods and sub-neighborhoods for this project include: o Flamingo o Palm View o Bayshore o La Gorce o Alison Island o North Shore The scope of this project primarily consists of the replacement of the existing approximate 1000 luminaires with new LED Luminaires and some pertinent electrical components. Part of the scope of work will include repairs at existing light pole locations and replacement or installation of some load centers, as noted in the plans. The scope also includes furnishing, installing, and integration of a lighting management system (LMS) per the plans and specifications. Question Deadline 07/02/2024 at 5:00 PM ET

Post-Bid

Playgrounds / Parks / Athletic Fields

$3,642,460.00

Public - City

Outdoor Lighting, Site Work

48

7

10

5

Subscribe For Documents

67 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
253
Active Projects
117
Bidding Soon
1,753
All Active Projects
776
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 6, 2024

October 7, 2024

October 26, 2025

img_map_placeholder

Multiple Locations, Miami Beach, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.