Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 22, 2024 at 8:00 PM
Updated November 7, 2025
Site work and renovation of a civil project in Fairmont, Minnesota. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
Biosolids and UV Disinfection Improvements. 1. New biosolids belt dryer with wet cake bunker, dried solids storage silo, and associated items; 2. Two new rotary fan press units with polymer feed, pumps, augers, and associated items; 3. Odor control scrubber; 4. Chlorine contact basin conversion to UV disinfection channel and building with new UV disinfection equipment; 5. Plant effluent reuse screen, pumps, and associated equipment; 6. Precast biosolids dryer building and masonry UV disinfection building; 7. Demolish existing biosolids, UV disinfection, and plant effluent reuse equipment; 8. Electrical and controls; 9. HVAC for new buildings; 10. Site work and site piping. GENERAL CONTRACTOR SCOPE OF WORK A. All equipment furnished under this section shall be fabricated, assembled, erected, and placed in proper operating condition in full conformity with detailed drawings, specifications, engineering data, instructions, and recommendations furnished by the SUPPLIER and equipment manufacturer. It is the responsibility of OTHERS to provide contract drawings of the overall system for review prior to installation. B. Installation of all equipment and materials as provided by SUPPLIER. C. Installation of wet cake bin, including leak testing after final assembly. All materials shall be supplied by CONTRACTOR including ensuring water or air source availability. D. Unloading and storage of equipment furnished by SUPPLIER to be administered by OTHERS. E. Unless otherwise stated, all equipment furnished by the SUPPLIER shall be shipped to the jobsite loose and installed by OTHERS. F. Supply and installation of all sample pumps and sample piping as required for instrumentation provided by the SUPPLIER. G. Supply and installation of air compressor and pressurized air piping as required for instrumentation provided by the SUPPLIER. H. Installation of all progressive cavity pump quench reservoirs and their fluid. Supply of glycol for the reservoirs. I. Provide all labor, materials, supplies and utilities as required for startup, adjustment and performance testing including laboratory equipment (such as CEM solids moisture analyzer), laboratory facilities, analytical work and chemicals. J. Provide all chemicals, lubricants, sealing fluids, thermal fluid for thermal fluid system, and other supplies required for equipment startup and adjustment. Including CEM microwave analyzer for solids measurement.
Award
Water / Sewer
$31,792,000.00
Public - City
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 25, 2024
September 25, 2024
To Be Determined, Fairmont, MN
Related To This Project
Fairmont, MN
Bid Date: Jul 12 2024
Fairmont, MN
Bid Date: Jan 21 2025
Fairmont, MN
Bid Date: Jan 28 2025
Fairmont, MN
--
Fairmont, MN
--
Fairmont, MN
Bid Date: Aug 19 2021
Fairmont, MN
Bid Date: Apr 07 2025
Fairmont, MN
Bid Date: Jul 25 2024
Fairmont, MN
Bid Date: Jun 05 2024
Fairmont, MN
Bid Date: May 31 2024
Fairmont, MN
Bid Date: May 31 2024
Fairmont, MN
Bid Date: May 07 2024
Fairmont, MN
Bid Date: Apr 30 2024
Fairmont, MN
Bid Date: Apr 25 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
