Published August 22, 2024 at 8:00 PM

Updated November 7, 2025

Site work and renovation of a civil project in Fairmont, Minnesota. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Biosolids and UV Disinfection Improvements. 1. New biosolids belt dryer with wet cake bunker, dried solids storage silo, and associated items; 2. Two new rotary fan press units with polymer feed, pumps, augers, and associated items; 3. Odor control scrubber; 4. Chlorine contact basin conversion to UV disinfection channel and building with new UV disinfection equipment; 5. Plant effluent reuse screen, pumps, and associated equipment; 6. Precast biosolids dryer building and masonry UV disinfection building; 7. Demolish existing biosolids, UV disinfection, and plant effluent reuse equipment; 8. Electrical and controls; 9. HVAC for new buildings; 10. Site work and site piping. GENERAL CONTRACTOR SCOPE OF WORK A. All equipment furnished under this section shall be fabricated, assembled, erected, and placed in proper operating condition in full conformity with detailed drawings, specifications, engineering data, instructions, and recommendations furnished by the SUPPLIER and equipment manufacturer. It is the responsibility of OTHERS to provide contract drawings of the overall system for review prior to installation. B. Installation of all equipment and materials as provided by SUPPLIER. C. Installation of wet cake bin, including leak testing after final assembly. All materials shall be supplied by CONTRACTOR including ensuring water or air source availability. D. Unloading and storage of equipment furnished by SUPPLIER to be administered by OTHERS. E. Unless otherwise stated, all equipment furnished by the SUPPLIER shall be shipped to the jobsite loose and installed by OTHERS. F. Supply and installation of all sample pumps and sample piping as required for instrumentation provided by the SUPPLIER. G. Supply and installation of air compressor and pressurized air piping as required for instrumentation provided by the SUPPLIER. H. Installation of all progressive cavity pump quench reservoirs and their fluid. Supply of glycol for the reservoirs. I. Provide all labor, materials, supplies and utilities as required for startup, adjustment and performance testing including laboratory equipment (such as CEM solids moisture analyzer), laboratory facilities, analytical work and chemicals. J. Provide all chemicals, lubricants, sealing fluids, thermal fluid for thermal fluid system, and other supplies required for equipment startup and adjustment. Including CEM microwave analyzer for solids measurement.

Award

Water / Sewer

$31,792,000.00

Public - City

Renovation, Site Work

338

64

33

13

Subscribe For Documents

50 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
57
Active Projects
42
Bidding Soon
451
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 25, 2024

September 25, 2024

Project location map

To Be Determined, Fairmont, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.