Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 21, 2024 at 8:00 PM
Updated August 22, 2024
Demolition, site work, paving, new construction, remodeling and addition to a mixed-use development in Moose Lake, Minnesota. Completed plans call for the addition of a 389-square-foot, three-story above grade municipal facility; for the demolition of a municipal facility; for the construction of a municipal facility; for the remodel of a municipal facility; for site work for a municipal facility; for paving for a municipal facility; road / highway; and road / highway.
Upgrade Truck Gate at MCF Moose Lake. Est. Value: $ 1,813,200.00. Est. Completion Date: July 31, 2025 Site Address: 1000 Lakeshore Drive. Description: State Project Number 78ML0093 Upgrade Truck Gate at MCF Moose Lake This Project has an 3% Targeted Group, Economically Disadvantaged, Veteran-Owned Small Businesses (TG/ED/VO) subcontracting goal. The TG/ED/VO subcontracting goal will not be a consideration in determining the lowest responsible Prime Contractor. A. The work will be done under one prime contract that includes: General, Mechanical, Demolition, Remediation, Excavation, Civil, and Electrical construction. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1.) Upgrade Truck Gate at MCF Moos Lake is remodeling and new construction for the truck gate facility at Moose Lake Correctional Facility, in Moose Lake, Minnesota. Work includes selective site and building demolition, remodeling, and new building addition for the guard station along with a temporary guard station, new secure controlled truck gate entry and enclosure, and paving site improvements. Question Deadline Jul 12, 2024 at 4:00 PM This solicitation includes qualification requirements. Attachment C of the Response Form contains the qualification requirements for the solicitation. Qualification requirements include, but are not limited to: Responding company has completed as a Prime Contractor, not as a subcontractor the work for at least three (3) contracts which have achieved Substantial Completion since June 2017 for construction of Upgrade Truck Gate at MCF Moose Lake or similar scope of work, preferably in secure facilities. Each of these contracts MUST have had a construction value of $900,000.00 or greater. This project has a 3 % Targeted Group (TG), Economically Disadvantaged (ED), and VeteranOwned (VO) Small Business (TG/ED/VO) subcontracting goals established
Award
Municipal
$2,974,289.00
Public - State/Provincial
Addition, Demolition, New Construction, Paving, Remodeling, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 24, 2024
September 23, 2024
1000 Lakeshore Dr, Moose Lake, MN
Related To This Project
Moose Lake, MN
--
Moose Lake, MN
Bid Date: Jan 24 2022
Moose Lake, MN
--
Moose Lake, MN
Bid Date: May 23 2025
Moose Lake, MN
Bid Date: Apr 24 2025
Moose Lake, MN
Bid Date: May 09 2025
Moose Lake, MN
Bid Date: Jun 05 2025
Moose Lake, MN
Bid Date: Jun 16 2025
Moose Lake, MN
Bid Date: Jun 06 2024
Moose Lake, MN
Bid Date: May 31 2024
Moose Lake, MN
Bid Date: May 14 2024
Moose Lake, MN
Bid Date: Apr 25 2024
Moose Lake, MN
--
Moose Lake, MN
--
Moose Lake, MN
Bid Date: Nov 18 2021
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
