BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Fayette, Mississippi. Completed plans call for site work for a water / sewer project.

The primary element of work shall consist of the construction of security fencing around a tank site and fence replacement at a water treatment plant site. Minority and woman's business enterprises are solicited to bid on this contract as prime contractors and are encouraged to make inquiries regarding potential subcontracting opportunities, equipment, material and/or supply needs. This contract is funded in whole or in part by funds from the Consolidated Appropriations Act of 214 (H.R. 3547); therefore, this project must comply with the American Iron and Steel requirements of the Act. City of Fayette reserves the right to reject any and all Bids and to waive any and all informalities, and reserves the right to hold all Bids for examination for a period not to exceed sixty (60) days and to award the Contract to the lowest and best Bid complying with the Plans and Specifications within said time. Any contract or contracts awarded under this invitation for bids are expected to be funded in whole or in part by anticipated funds from the Drinking Water Systems Improvements Revolving Loan Fund (DWSIRLF) loan program from the State of Mississippi. Neither the State of Mississippi, the Local Governments and Rural Water Systems Improvements Board, the State Department of Health, nor any of their employees is or will be a party to this invitation for bids or any resulting or related contracts. This procurement will be subject to all applicable sections of the Mississippi Code of 1972, Annotated, as they apply to local governments, in accordance with Appendix D of the DWSIRLF Program Regulations. Construction of Security Fencing Around a Tank Site and Fence Replacement at a Water Treatment Plant Site - Fence, Fence Replacement, Gate, 12' Double, Gate, 3' Single, Limestone (No. 57) General: This work shall consist of the construction of a six-foot (6') chain link fence surmounted by three strands of barbed wire around the sites or designated portion of the sites. A double swing gates and a walk gate shall be required. Location: The Owner's elevated tank site is located behind City Hall at 59 Medgar Evers Blvd. and the treatment plant site is located at 246 Spring Street in Fayette, Mississippi. Site plats are included as an appendix to these specifications

Award

Water / Sewer

$13,181.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
26
Active Projects
14
Bidding Soon
210
All Active Projects
81
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 4, 2024

November 4, 2024

img_map_placeholder

246 Spring St, Fayette, MS

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.