BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 31, 2024 at 8:00 PM

Updated August 1, 2024

Site work and paving for a road / highway in Tillamook, Oregon. Completed plans call for site work for a road / highway; and for paving for a road / highway.

*As of July 31, 2024, project was awarded to Road & Driveway CO., awarded amount is $102,350.80. Each prospective contractor must provide full company name, address, contact name, phone and e-mail address at the time of request. Bidders will not be required to be pre-qualified under ORS 279B.120. This contract is for a project that is subject to ORS 279C.800 to 279C.870 (Prevailing Wage Law). This project consists of paving 2,330 linear feet of Sunset Drive in Pacific City, Tillamook County from the southern property line of 6045 Pacific Avenue south to the entrance of Bob Straub State Park. General Notes: 1. Tillamook County Public Works (TCPW) summer hours are Monday-Thursday from 7:00 am to 5:30 pm. Winter hours are Monday - Friday from 7:30 am to 4:00 pm. Office phone is (503) 842-3419. 2. Tillamook Shop: 503 Marolf Loop Road, Tillamook OR, 97141 3. Contractor is required to conform to the 2021 Oregon Standard Specification for Construction and Tillamook County Public Works (TCPW) requirements for all materials and work, except as listed on the plans or in the Project Notes. 4. Contractor responsible to contact One Call for project utility locations. 5. Material that will be removed from the project site will become the property of the Contractor unless otherwise identified. Dispose of material in a legal and safe manner following applicable governing rules. 6. Contactor is required to obtain and comply with all applicable permits & licenses. 7. Inspection conducted by TCPW staff does not relieve the contractor's obligations to local, state, or federal laws, codes, agency requirements, or permit requirements. 8. Contractor is responsible for site security and safety. 9. Contractor is responsible for staging areas not otherwise identified. The County is not responsible for private agreements between the Contractor and private landowners. 10. Contractor is limited to working within the right-of-way unless an easement has been identified. 11. Contractor is solely responsible for temporary erosion control measures. 12. Provide traffic control in compliance with the Oregon Temporary Traffic Control Handbook, current version. Full road closure is permitted up to but not exceeding twenty minutes.

Award

Roads / Highways

$102,350.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
152
Active Projects
83
Bidding Soon
867
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2024

July 31, 2024

Project location map

Sunset Dr, Tillamook, OR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.