Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 18, 2024 at 8:00 PM
Updated July 19, 2024
Renovation of a water / sewer project in North Salt Lake, Utah. Working plans call for the renovation of a water / sewer project.
South Davis Sewer District seeks to replace 1 L.E.S. Inc Boiler Model HW-1450, Dual Fuel (Natural Gas and Bio-Gas) This courtesy posting is an advertisement of a procurement opportunity for South Davis Sewer District (SDSD), not the Division of Purchasing. Responses should be directed to the designated individual/office as designated in the solicitation document. The Division of Purchasing does not accept responses for courtesy postings. The contract award for this solicitation will not be posted on this website. Instead, you will need to contact the designated individual/office as identified in the solicitation document. This solicitation posting will be canceled/closed upon the closing date of this solicitation; however, a vendor's response will still be evaluated by SDSD as described in the solicitation document. The Division of Purchasing is neither the issuing or conducting procurement unit for this solicitation, as such it is the vendor's responsibility to review the entire solicitation in order to comply with any requirements. Q&A: To Jacob Scott at jscott@sdsd.us For any inquiries or to schedule a site walk-through outside of the scheduled walk-through, contact Jacob Scott at jscott@sdsd.us. We look forward to receiving your proposals. South Davis Sewer District invites qualified contractors to submit proposals for the replacement of boilers at the South Treatment Plant located at 1380 West Center Street, North Salt Lake City, UT. The Scope of work includes replacing an L.E.S. Inc Boiler. Project Details: Replace 1 L.E.S. Inc Boiler Model HW-1450, Dual Fuel (Natural Gas and Bio-Gas) Seeking a firetube boiler, minimum of 40 HP, preferably a 60 HP. Lockout/Tagout boiler for safety. Disconnect all electrical, control wiring, heat piping, gas piping, and vent piping from old boiler. Remove and dispose of old boiler. Set new boiler in place. Connect all piping and wiring to new boiler. Start boiler and ensure proper operation, including alarming to on site SCADA system.
Final Planning
Water / Sewer
$400,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 15, 2024
January 18, 2025
1380 W Center St, North Salt Lake, UT
Related To This Project
North Salt Lake, UT
Bid Date: Oct 14 2024
North Salt Lake, UT
Bid Date: Oct 17 2024
North Salt Lake, UT
--
North Salt Lake, UT
--
North Salt Lake, UT
--
North Salt Lake, UT
--
North Salt Lake, UT
--
North Salt Lake, UT
--
North Salt Lake, UT
Bid Date: Jun 11 2024
North Salt Lake, UT
Bid Date: May 29 2024
North Salt Lake, UT
Bid Date: May 29 2024
North Salt Lake, UT
Bid Date: Apr 30 2024
North Salt Lake, UT
Bid Date: May 16 2024
North Salt Lake, UT
--
North Salt Lake, UT
Bid Date: Mar 27 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
