Renovation of a municipal facility in Sanikiluaq, Nunavut. Completed plans call for the renovation of a municipal facility.

Scope of Work Package #tp-1-1-metals This Scope of Work is Not All Inclusive of All Required Tasks and Activities for This Contract, However is Meant to Be Used as a Guide to Clarify Areas of Uncertainty. All Items Contained Within Shall Be Allowed for, and Read, in Conjunction With the Remaining Contract Documents. 2 Trade Contractor to Include Supply of the Following Sections: 05 00 00 - Metals (Bollard Covers, Pipe Handrails) Scope of Work Package #tp-1-2-millwork This Scope of Work is Not All Inclusive of All Required Tasks and Activities for This Contract, However is Meant to Be Used as a Guide to Clarify Areas of Uncertainty. All Items Contained Within Shall Be Allowed for, and Read, in Conjunction With the Remaining Contract Documents. Trade Contractor to Include Supply & Installation of the Following Sections; 06 00 00-wood, Plastic & Composites Scope of Work Package #tp-1-3- Firestopping This Scope of Work is Not All Inclusive of All Required Tasks and Activities for This Contract, However is Meant to Be Used as a Guide to Clarify Areas of Uncertainty. All Items Contained Scope of Work Package #tp-1-4-steel Siding/roofing 1 This Scope of Work is Not All Inclusive of All Required Tasks and Activities for This Contract, However is Meant to Be Used as a Guide to Clarify Areas of Uncertainty. All Items Contained Within Shall Be Allowed for, and Read, in Conjunction With the Remaining Contract Documents. 2 Trade Contractor to Include Supply & Install of the Following Sections; 1 Steel Siding & Roofing Scope of Work Package #tp-1-5-doors 1 This Scope of Work is Not All Inclusive of All Required Tasks and Activities for This Contract, However is Meant to Be Used as a Guide to Clarify Areas of Uncertainty. All Items Contained Within Shall Be Allowed for, and Read, in Conjunction With the Remaining Contract Documents. 2 Trade Contractor to Include Supply and Install of the Following Sections; 08 11 13-steel Doors and Frames 08 14 16-flush Wood Doors 08 7100-door Hardware 1 Includes Door Hardware for Existing Doors 2 Includes Weather Stripping 08 80 00-glass and Glazing (for Doors Only) Scope of Work Package #tp-1-6- Vinyl Windows This Scope of Work is Not All Inclusive of All Required Tasks and Activities for This Contract, However is Meant to Be Used as a Guide to Clarify Areas of Uncertainty. All Items Contained Within Shall Be Allowed for, and Read, in Conjunction With the Remaining Contract Documents. Trade Contractor to Include Supply and Install of the Following Sections; 1 08 53 13-vinyl Windows Scope of Work Package #tp-1-7- Glazing Film This Scope of Work is Not All Inclusive of All Required Tasks and Activities for This Contract, However is Meant to Be Used as a Guide to Clarify Areas of Uncertainty. All Items Contained Within Shall Be Allowed for, and Read, in Conjunction With the Remaining Contract Documents. 1 Upon selection and acceptance of Bid, any Trade Contractor whose Bid total is more than $500,000 shall promptly provide and pay for a Performance Bond in the amount of 50% of the Contract Price covering the Performance of the Contract including the requirements of Warranty. .1Upon selection and acceptance of Bid, any Trade Contractor whose Bid total is more than $500,000 shall promptly provide and pay for a Labour and Material Payment Bond in the amount of 50% of the Contract Price. Question Acceptance Deadline: 2024/06/24 05:00:00 PM CDT Official bid documents must be obtained from www.merx.com . * The project value listed reflects the package estimate.

Post-Bid

Municipal

$3,000,000.00

Public - State/Provincial

Renovation

43

11

7

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
1
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 9, 2024

August 5, 2024

img_map_placeholder

Multiple Locations, Sanikiluaq, NU

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.