Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 2, 2024 at 8:00 PM
Updated July 10, 2024
Renovation of a municipal facility in Sanikiluaq, Nunavut. Completed plans call for the renovation of a municipal facility.
Scope of Work Package #tp-1-1-metals This Scope of Work is Not All Inclusive of All Required Tasks and Activities for This Contract, However is Meant to Be Used as a Guide to Clarify Areas of Uncertainty. All Items Contained Within Shall Be Allowed for, and Read, in Conjunction With the Remaining Contract Documents. 2 Trade Contractor to Include Supply of the Following Sections: 05 00 00 - Metals (Bollard Covers, Pipe Handrails) Scope of Work Package #tp-1-2-millwork This Scope of Work is Not All Inclusive of All Required Tasks and Activities for This Contract, However is Meant to Be Used as a Guide to Clarify Areas of Uncertainty. All Items Contained Within Shall Be Allowed for, and Read, in Conjunction With the Remaining Contract Documents. Trade Contractor to Include Supply & Installation of the Following Sections; 06 00 00-wood, Plastic & Composites Scope of Work Package #tp-1-3- Firestopping This Scope of Work is Not All Inclusive of All Required Tasks and Activities for This Contract, However is Meant to Be Used as a Guide to Clarify Areas of Uncertainty. All Items Contained Scope of Work Package #tp-1-4-steel Siding/roofing 1 This Scope of Work is Not All Inclusive of All Required Tasks and Activities for This Contract, However is Meant to Be Used as a Guide to Clarify Areas of Uncertainty. All Items Contained Within Shall Be Allowed for, and Read, in Conjunction With the Remaining Contract Documents. 2 Trade Contractor to Include Supply & Install of the Following Sections; 1 Steel Siding & Roofing Scope of Work Package #tp-1-5-doors 1 This Scope of Work is Not All Inclusive of All Required Tasks and Activities for This Contract, However is Meant to Be Used as a Guide to Clarify Areas of Uncertainty. All Items Contained Within Shall Be Allowed for, and Read, in Conjunction With the Remaining Contract Documents. 2 Trade Contractor to Include Supply and Install of the Following Sections; 08 11 13-steel Doors and Frames 08 14 16-flush Wood Doors 08 7100-door Hardware 1 Includes Door Hardware for Existing Doors 2 Includes Weather Stripping 08 80 00-glass and Glazing (for Doors Only) Scope of Work Package #tp-1-6- Vinyl Windows This Scope of Work is Not All Inclusive of All Required Tasks and Activities for This Contract, However is Meant to Be Used as a Guide to Clarify Areas of Uncertainty. All Items Contained Within Shall Be Allowed for, and Read, in Conjunction With the Remaining Contract Documents. Trade Contractor to Include Supply and Install of the Following Sections; 1 08 53 13-vinyl Windows Scope of Work Package #tp-1-7- Glazing Film This Scope of Work is Not All Inclusive of All Required Tasks and Activities for This Contract, However is Meant to Be Used as a Guide to Clarify Areas of Uncertainty. All Items Contained Within Shall Be Allowed for, and Read, in Conjunction With the Remaining Contract Documents. 1 Upon selection and acceptance of Bid, any Trade Contractor whose Bid total is more than $500,000 shall promptly provide and pay for a Performance Bond in the amount of 50% of the Contract Price covering the Performance of the Contract including the requirements of Warranty. .1Upon selection and acceptance of Bid, any Trade Contractor whose Bid total is more than $500,000 shall promptly provide and pay for a Labour and Material Payment Bond in the amount of 50% of the Contract Price. Question Acceptance Deadline: 2024/06/24 05:00:00 PM CDT Official bid documents must be obtained from www.merx.com . * The project value listed reflects the package estimate.
Post-Bid
Municipal
$3,000,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 9, 2024
August 5, 2024
Multiple Locations, Sanikiluaq, NU
Related To This Project
Sanikiluaq, NU
Bid Date: Oct 04 2024
Sanikiluaq, NU
Bid Date: Mar 05 2025
Sanikiluaq, NU
Bid Date: May 09 2025
Sanikiluaq, NU
Bid Date: Jun 16 2025
Sanikiluaq, NU
Bid Date: Dec 19 2025
Sanikiluaq, NU
--
Sanikiluaq, NU
Bid Date: Jun 20 2024
Sanikiluaq, NU
Bid Date: Jun 05 2024
Sanikiluaq, NU
Bid Date: Jun 05 2024
Sanikiluaq, NU
Bid Date: May 02 2024
Sanikiluaq, NU
Bid Date: Apr 22 2024
Sanikiluaq, NU
Bid Date: Feb 07 2024
Sanikiluaq, NU
--
Sanikiluaq, NU
Bid Date: Apr 01 2022
Design, Manufacture, Deliver Testing And Commissioning Of Feeder Distribution Transformers - 4632930
Sanikiluaq, NU
Bid Date: Mar 21 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
