BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Beverly, Washington. Completed plans call for site work for a water / sewer project.

Estimated Contract Value : $400,000.00 Replace Tainter Gate 12 Trunnion Pins in Wanapum Dam Spillway Should the successful Bidder fail or refuse to execute a Contract Form and furnish a Payment and Performance Bond within 10 days following receipt of notification of Contract Award, the Bidder shall be considered to have abandoned the Bid and the check or Bid Bond in the amount of not less than 5% of the Bid delivered with the Bid shall thereupon be due and owing to the District as liquidated damages for such failure or refusal, and the District may thereupon award the Contract to any other Bidder. To assure compliance with the terms of the Contract Documents, the Contractor shall furnish a Payment and Performance Bond in an amount equal to 100% of the amount of the Contract Price, excluding Washington State Sales Tax, with surety or sureties who are acceptable to the District. This Payment and Performance Bond shall remain in force for a period of 365 days after Final Acceptance. Thirty days following this expiration, the original Payment and Performance Bond shall be destroyed unless the Surety or Contractor requests the return of the bond, in writing, prior to destruction. The Payment and Performance Bond must be on the form provided with these Contract Documents as Exhibit "D". The cost of the Payment and Performance Bond shall be included in the Total Bid Price. The District reserves the right to waive minor errors or irregularities in any Bid if it appears to the District that such errors or irregularities in any Bid were made through inadvertence and are not material. Any errors or irregularities so waived must be corrected on the Bid on which they occur prior to the execution of any Contract Form which may be awarded thereon. No Bidder may withdraw their Bid after the hour set for the opening thereof, unless and until Contract Award has been delayed for a period exceeding 30 days after the date of Bid opening. Question Deadline 07/10/2024 The deadline to submit questions or request for clarification to the District shall be five business days prior to the time and date that Bids are due. Contact bschwab@gcpud.org. The Contractor shall furnish all materials, equipment, machinery, tools, plant, labor, and transportation to perform the work specified in these Contract Documents for the Replace Tainter Gate 12 Trunnion Pins in Wanapum Dam Spillway located at 14353 Hwy 243 S, Beverly, WA 99321. SR-2. COMPLETION SCHEDULE/LIQUIDATED DAMAGES The Contractor shall not commence any work under this Contract until after all of the following: (1) receipt of notification of Contract Award; (2) full execution of the Contract Form; (3) providing the required Payment and Performance Bond; (4) providing the required Insurance Certificates; (5) attending the pre-work conference, if any; (6) acceptance by the District of the Contractor's Site Specific Safety Plan or Accident Prevention Plan, as applicable; and (7) receipt of Notice to Proceed signed by the District. The Contractor shall complete such work in a diligent and workmanlike manner.

Award

Water / Sewer

$373,075.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

13

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
45
Active Projects
23
Bidding Soon
505
All Active Projects
147
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 15, 2024

August 14, 2024

November 20, 2024

img_map_placeholder

14352 WA-243, Beverly, WA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.