BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 26, 2024 at 8:00 PM

Updated August 27, 2024

Renovation of a transportation facility in Monterey, California. Completed plans call for the renovation of a transportation facility.

In general, the project includes the following major elements o Mill and fill two keel sections of the existing asphalt paved surface. o Groove the new asphalt pavement surface. o Perform crack fill and seal. o Perform accumulated rubber removal. o Apply rapid cure asphalt seal coat. o Apply new pavement markings. The work comprises of the following o Airfield safety and security. o Construction site environmental compliance. o Mill the existing asphalt pavement surface along the runway centerline in two distinct locations (one favoring each end). o Fill the milled area with new hot-mix asphalt pavement. o Groove the new pavement surface, consistent with the existing grooved surface all around. o Perform crack fill and seal, including routing of existing cracks and pavement cold joints. o Remove accumulated rubber. o Obliterate some pavement markings to 50%. o Apply an emulsified asphalt seal coat to the runway and paved shoulder surfaces, using a hand shield to prevent seal coat application on pavement markings intended to remain. o Apply new pavement markings, one-coat or two-coat as appropriate.

Award

Transportation Terminals

$2,506,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
205
Active Projects
85
Bidding Soon
1,127
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 11, 2024

September 9, 2024

Project location map

To Be Determined, Monterey, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.