Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a parking garage in South Lake Tahoe, California. Completed plans call for the renovation of a parking garage.
**As of September 19, 2024 project has not been awarded , Anticipated award date is on September 24, 2024** Work to be performed includes, but is not limited to Installation of agency agency-furnished Parking Access and Revenue Control System (PARCS), Automated Parking Guidance System (APGS), and Electrical Vehicle Charging Stations (EVCS). The Contractor shall commence the physical start of work by April 14, 2025, inside the garage and May 1, 2025, for work outside the garage. 1. Milestone #1: Substantial Completion of the PARCS Installation and Acceptance Testing (in accordance with Section 9.8 of the Special Provisions) by May 23, 2025. 2. Milestone #2: Substantial Completion of the APGS Installation and Acceptance Testing (in accordance with Section 9.8 of the Special Provisions) by June 20, 2025. 3. Milestone #3: Substantial Completion of the EVCS Installation and Acceptance Testing (in accordance with Section 9.8 of the Special Provisions) by July 11, 2025. 4. Final Completion by July 31, 2025. Liquidated damage in the amount of $500 per day will be assessed for time over 21 days. Each Bid must be accompanied by cash, a certified or cashier's check, or a bond in the sum of not less than ten percent (10%) of the total aggregate of the Bid price, including all additive Bid items, as required in the Instructions to Bidders. Contract Bonds required as prescribed in this Section 3 of the Standard Specifications, as modified by the Special Provisions and Contract Documents, shall include a Performance Bond equal to one hundred percent (100%) of the amount of the Agreement, and a Payment Bond equal to one hundred percent (100%) of the Agreement, and any other bonds, including any Maintenance and Warranty Bond, as may be required by the City. The form of the Performance Bond (Document 00620) and the Payment Bond (Document 00610) to be provided by the successful Bidder are included within the Bid Documents. Project Manager: City of South Lake Tahoe, Contact: Jeff Roberson Email: jroberson@cityofslt.us Phone No.: (530) 542-6521 The STJPPFA, in its sole discretion, reserves the right to reject any and all Bids, and to waive any errors or discrepancies in the Bids. The estimated cost for the Base Bid Schedule of this Work is in the range of $150,000 to $240,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Deadline 08/23/2024 at 5:00 PM PT
Bid Results
Parking Garage
$207,932.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 28, 2024
April 14, 2025
1 Bellamy Ct., South Lake Tahoe, CA
Related To This Project
South Lake Tahoe, CA
Bid Date: Oct 08 2024
South Lake Tahoe, CA
Bid Date: Jul 30 2024
South Lake Tahoe, CA
Bid Date: Jul 22 2024
South Lake Tahoe, CA
--
South Lake Tahoe, CA
Bid Date: Sep 06 2024
South Lake Tahoe, CA
Bid Date: Aug 22 2024
South Lake Tahoe, CA
Bid Date: Dec 04 2024
South Lake Tahoe, CA
Bid Date: Sep 06 2024
South Lake Tahoe, CA
Bid Date: Jul 19 2024
South Lake Tahoe, CA
Bid Date: Jul 15 2024
South Lake Tahoe, CA
Bid Date: Jun 13 2024
South Lake Tahoe, CA
Bid Date: Jun 27 2024
South Lake Tahoe, CA
Bid Date: Jul 26 2024
South Lake Tahoe, CA
Bid Date: Jun 25 2024
South Lake Tahoe, CA
Bid Date: Jun 25 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.