BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Woodstock, Illinois. Contact the soliciting agency for additional information.

The County of McHenry seeks qualified bidders to provide seasonal snow and ice removal services, subject to continuing need and availability of funds. This is a multi-year bid. Years 1 & 2 from 12/1/24-11/30/26, year 3 (optional) 12/1/26-11/30/27, and year 4 (optional) 12/1/27-11/30/28. This is NOT a prevailing wage bid. Seasonal Pricing will include all snow and ice removal and pretreating operations for the entire snow season. The work shall commence when the snow or ice event is predicted and end when the snow and or ice event ends. Parking surfaces shall be cleared during the event as needed to allow for safe vehicular and pedestrian traffic to occur. The entire site shall be pre-treated, cleared and ice melt applied, as needed, to leave parking surfaces in the best possible condition. Black ice formation shall be anticipated when conditions are correct and treated. Snow melt (from accumulated piles) shall also be treated so that parking surfaces remain safe. If the forecast is estimating an ice event or rain changing to ice and/or snow event, liquid pre-treatment of parking aisle surfaces is required for both de-icing and anti-icing operations. If the forecast timing does not allow for the proper treatment prior to the event and ice melt is used, this must be communicated to the county. The Seasonal Snow Season begins on December 1st and ends on November 30th, which mirrors our fiscal year. Bills will be paid in 6 equal installments, December, January, February, March, April and November. The County expects equipment to be on site and ready to remove snow ahead of this December 1 start date in the first year of the contract, in subsequent years the expectation is to be ready ahead of November 1st. All equipment must be off site by the end of April. 1. The Contractor shall make every attempt to begin snow removal and ice melt operations at each of the sites at a time that will leave the area safe for vehicular and pedestrian traffic by 7:30 a.m. 2. The Contractor shall not pile snow near line of sight and stop signs at or near intersections of traffic lanes or crosswalks. 3. No equipment shall cross sidewalks. 4. Snow stock must be pushed off the parking lot as accumulated as to minimize the loss of parking spaces. 5. Drainage areas must be kept free from snow stockpiles. 6. Ice melt applications should be applied in sufficient quantities to provide bare pavement surfaces. 7. Ice melt applications should be applied prior to an anticipated formation of black ice and prior to and during freezing rain events. 8. Brine should be used, when possible, in order to limit salt and calcium runoff. 9. Contractor and its employees shall operate their equipment in a safe, courteous and efficient manner. 10. If called by Facility staff the Contractor should be at site or sites requested within the hour. 11. Pre-approved contractor equipment will be stored at the property adjacent to the Administration Building and will have access to 1) 120v 20-amp receptacle. July 2, 2024 Questions due no later than 12:00PM CST. Submit via email July 8, 2024 Addendum posted on County website no later than 4:00PM CST

Post-Bid

Roads / Highways

Public - County

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
187
Active Projects
101
Bidding Soon
2,128
All Active Projects
909
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 11, 2024

December 1, 2024

img_map_placeholder

Multiple Locations, Woodstock, IL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.