BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 29, 2025 at 8:00 PM

Updated July 30, 2025

Site work and paving for a road / highway in Woodstock, Illinois. Working plans call for site work for a road / highway; and for paving for a road / highway.

As of July 29, 2025, per owner, project has been awarded, Engineer identified. No general contractor yet. Timeframe for Contractors to be able to bid currently seems to be late 2026/early 2027 – not definite yet. Construction to begin early to mid 2027. McHenry County Division of Transportation desires to contract with a qualified engineering firm to assist the County of McHenry, as project lead, in developing Phase I Preliminary Engineering, with an option for Phase II Design Engineering services, for a multi-use path along the west side of Wilmot Road from James Road in Burton Township (Section 17, Township 46 North, Range 9 East) in McHenry County to the north end of Wilmot Road at the Illinois/Wisconsin State Line in Lake County. All work shall conform to IDOT/FHWA policies and procedures for federal aid projects and will be completed under applicable BLR and BDE Manuals. July 3, 2024 Vendor Questions due via E-Mail No Later than 12:00PM CST. Submit to dmleonard@mchenrycountyil.gov Anticipated Work Items may include, but are not limited to the following: Perform necessary survey work - drone survey capability desired and to be considered Perform drainage, floodplain, and wetland studies Prepare crash analysis & design traffic data Prepare all necessary reports, including: Location Drainage Study Wetland Report Geotechnical Report Intersection Design Study Lighting Analysis Alternatives Analysis Report Traffic Management Analysis TS&L's for underpasses Complete a Project Development Report. Perform necessary environmental coordination to secure Design Approval Prepare and submit all necessary permits (ACOE, IDNR-OWR, P&D, Village of Spring Grove, Village of Fox Lake, County of McHenry, County of Kenosha, County of Lake, - etc.) Prepare plats and legal descriptions (Phase II Task) Provide coordination for public involvement. Provide coordination with property owner, utilities, local agencies, and IDOT Pending Phase II Contract Approval - Complete the necessary Phase II plans, specifications, and estimates as required, based upon the approved Phase I design.

Final Planning

Roads / Highways

$1,229,824.00

Public - County

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
596
Active Projects
170
Bidding Soon
3,820
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2027

Project location map

Multiple Locations, Woodstock, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.