BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 25, 2025 at 8:00 PM

Updated October 26, 2025

Site work and outdoor lighting for a civil project in Chappell, Nebraska. Completed plans call for site work for a road / highway; and for outdoor lighting for a road / highway.

1. This work shall consist of minimizing the exposure of the environment, including Waters of the State as defined by Title 126, Chapter 1 from the Nebraska Department of Environment and Energy (NDEE), to hazardous materials. This specification also includes the requirements for clean-up of releases (spills) of hazardous materials. 2. NDOT defines hazardous materials as a broad category of materials that, because of their quantity, concentration, physical or chemical characteristics, pose a potential hazard to human health and safety or to the environment if released into the environment. Hazardous materials include, but are not limited to, materials that are regulated as solid waste, hazardous waste, and other wastes contaminated with hazardous substances, radioactive materials, petroleum products, toxic substances, and other pollutants. Contract Id: 51669 Federal Project No. Stp-80-1(207) Location: I-80, District 5 High Mast Tower Replacement In Counties: Deuel, Cheyenne Electrical, General (All Classes) Start Date: 08/03/2026 Working Days: 65 Price Range: $0.00 to $5,000,000.00 This project is funded under the Federal-Aid Highway Act, all appropriate Federal requirements will apply. Quantities Shown Herein Are for Information Only and Should Not Be Used for Bidding Purposes. The Department Reserves the Right to Change These Quantities Without Notice. The last day to submit acceptable prequalification statements for this letting is by 5:00 P.M. on Saturday September 27, 2025. If you have any questions as you are using our Website, please contact us at: Nebraska Department of Transportation Contract Lettings Section 1500 Nebraska Parkway Lincoln, NE 68502-5480 Phone (402) 479-4532 FAX (402) 479-3803 Email: ndot.contractlettings@nebraska.gov NEDOT - Call 505 - Electrical, General (All Classes) - I-80 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$1,421,225.00

Public - State/Provincial

Outdoor Lighting, Site Work

59

11

2

5

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
12
Active Projects
7
Bidding Soon
68
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 2, 2025

August 3, 2026

Project location map

Interstate 80, Chappell, NE

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.