BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Riverside, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The Contractor shall furnish all labor, supervision, material, parts, tools, equipment, storage, transportation, waste disposal and services necessary to perform cold planning (surface planning) consisting of approximately 34,023 square feet of existing asphalt concrete on various roads in the unincorporated area of Riverside County, in strict accordance with all of the Contract Documents. LICENSE REQUIRED - The following license is required for this project: C-12 - Earthwork and Paving Contractors, C-31 - Construction Zone Traffic Control Contractor, and A - General Engineering Contractor Deadline for Submission of Questions: Email: mrossow@rivco.org (E-mail required). It is the responsibility of the bidder to confirm transmission of correspondence Date: June 19, 2024 Time: On or before 1:30 p.m. PST Must be in the form of an Email The following information shall appear on both the envelope and the bid cover sheet on the packet: RFB number RFB Title Closing date and time. BID GUARANTEE The enclosed certified or cashier's check or bid bond on the provided form, made payable to the County in the amount of ten percent (10%) of the total bid, is hereby given as a guarantee that the bidder will execute and deliver the Agreement and required bonds if awarded the contract. In the event that the bidder fails or refuses to execute and deliver said documents, such check or bond is to be charged with the costs of the damages experienced by the County as a result of such failure or refusal. LIQUIDATED DAMAGES - It is agreed that time is of the essence for completion of this work. Therefore, the parties agree the awarded bidder (Contractor) shall pay to the County, as fixed and liquidated damages, and not as penalty, a dollar sum in the amount of $250.00 per day for each calendar day beyond the allowed time stated in the Contract Documents after which the work is completed. Liquidated damages shall be assessed after the commencement of the 5th day. TIME FOR COMPLETION - The work, in any area shall commence 5 business days upon notification from the County or on a date to be specified in a written order from the County. Each area shall be completed within sixty (60) days, and All work, in all areas shall be completed by June 30, 2025.

Award

Roads / Highways

$67,025.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
209
Active Projects
121
Bidding Soon
2,213
All Active Projects
1,027
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 28, 2024

August 28, 2024

img_map_placeholder

Multiple Locations, Riverside, CA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.