BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 26, 2024 at 8:00 PM

Updated July 27, 2024

Site work for a water / sewer project in Sugar Land, Texas. Completed plans call for site work for a water / sewer project.

Construction of North Wastewater Treatment Plant Improvements - Stormwater Clarifier Rehabilitation, including: Replacement of clarifier mechanisms in Stormwater Clarifier No. 1 and Stormwater Clarifier No. 2 complete and in place. Replacement of sludge underflow telescoping valves at Stormwater Clarifier No. 1 and Stormwater Clarifier No. 2 complete and in place. Replacement of external sludge and drain valves at Stormwater Clarifier No. 1 and Stormwater Clarifier No. 2 complete and in place. Replacement of all grating and handrail at Stormwater Clarifier No. 1 and Stormwater Clarifier No. 2 complete and in place Installation of submersible chopper scum pumps and associated discharge piping and valves at Stormwater Clarifier No. 1 and Stormwater Clarifier No. 2 complete and in place. Installation of forcemain connecting proposed scum pumps to existing WAS piping complete and in place. Replacement of damaged stair treads on access stair at Stormwater Clarifier No. 1 complete and in place. Relocation of access stair and replacement of damaged stair treads on access stair at Stormwater Clarifier No. 2. All electrical and instrumentation work associated with the replacement clarifier mechanisms and proposed scum pumps complete and in place. Repair and reconstruction of existing improvements affected by the Work, and incidentals for complete and usable facility. Start up and Commissioning of the Work. LOCATION OF WORK: NORTH WASTEWATER TREATMENT PLANT Questions regarding this bid must be received on or before 5 pm on Wednesday, July 17, 2024. Please post all questions on online The City Council will award the contract as provided in the Invitation to Bid. The City of Sugar Land will give notice of the contract award within ninety (90) calendar days after the opening date and time.

Post-Bid

Water / Sewer

$5,000,000.00

Public - City

Site Work

45

22

2

6

Subscribe For Documents

79 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
74
Active Projects
4
Bidding Soon
1,965
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 25, 2024

September 23, 2024

Project location map

To Be Determined, Sugar Land, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.