Published September 3, 2024 at 8:00 PM

Updated October 1, 2024

Site work for a power facility in Danvers, Massachusetts. Completed plans call for site work for a power facility.

WORK DESCRIPTION A. It is the intent of this Specification to provide a complete, electrical substation, ready for service. Minor items and details may not be fully addressed by this Specification, but shall be included by the Contractor. B. The Work of this project will take place on a parcel of property that is currently owned by the OWNER and is adjacent to the existing Northland Substation. The project site is presently a paved parking lot. C. This project will replace the existing Northland Substation. The work will progress in five phases: 1. Phase 1 - Removal of existing pavement, site grading, installation of foundations, oil containment system, manholes, ductbank, conduit, ground grid, fence and surfacing 2. Phase 2 - Connection of Owner furnished power transformers and switchgear and switchgear to riser poles/existing underground, including medium and low voltage cabling, splicing and terminations 3. Phase 3 - Cut over distribution load to new switchgear 4. Phase 4 - Demolition and disposal of existing Northland Substation and resurfacing 5. Phase 5 - Complete any remaining work and closeout the project D. Contractor shall be completely familiar with and be experienced in all aspects of Electrical Substation civil and electrical installation and construction, and shall ascertain the scope of the work from the Specifications and Drawings. It shall be the responsibility of Contractor to become familiar with the equipment being furnished by OWNER. Failure of Contractor to correctly interpret the scope of work necessary to properly install or connect the equipment furnished by OWNER will not be considered as the basis of claim for extra compensation. Northland Substation Construction - Construction to include excavation/grading/installation of foundations/oil containment system/underground conduit systems/manholes/grounding power/cabling/splicing/terminations/yard surfacing, etc. Bidders that find discrepancies in or omissions in the Specification and/or Drawing(s) or have any doubt as to the meaning or intent of any part of the Contract Documents shall immediately, but not later than 4:00 pm on the fourth business day prior to the currently scheduled Bid opening, notify in writing: Mr. Jason Small, Engineering and Operations Manager Danvers Electric Department 2 Burroughs Street Danvers, MA 01923 Project Code 862696

Award

Power Plant

$3,650,400.00

Public - City

Site Work

32

13

17

4

Subscribe For Documents

66 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Project Management and Coordination, Project Meetings, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties, Project Record Documents
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Material Testing, Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Cold-Formed Metal Framing, Metal Fabrications, Metal Floor Plates
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Chairs
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Low-Voltage Electrical Distribution
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Aggregate Surfacing, Crushed Stone Surfacing, Site Improvements, Fences and Gates, Chain Link Fences and Gates
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps, Manufacturing Equipment, Dies and Molds, Molds
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas and Liquid Storage, Gas and Liquid Storage Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
299
Active Projects
176
Bidding Soon
2,380
All Active Projects
1,120
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 6, 2024

September 30, 2024

img_map_placeholder

68 Ash St, Danvers, MA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Northland Substation Construction

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.