Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 15, 2024 at 8:00 PM
Updated July 18, 2024
Site work and paving for a mixed-use development in Grafton, Massachusetts. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
North Street Pedestian Improvements. Work includes: the construction of new concrete pedestrian curb ramps, hot mix asphalt driveways and sidewalk, granite curb, minor drainage alterations, tree removal and protection, removal and resetting of stone walls, pavement markings and other incidental work. Contractor Qualification Highway Division Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. The work under this Contract consists of constructing pedestrian improvements, including new sidewalk and pedestrian curb ramps, along one side of North Street in Grafton. The project limits are from the existing sidewalk on Stonegate Circle to the intersection of Old Westboro Road and North Street. The work includes the construction of new cement concrete pedestrian curb ramps and sidewalk, hot mix asphalt driveways, granite curb, minor drainage alterations, tree removal and protection, removal and resetting of stone walls, pavement markings and other incidental work. All work under this Contract shall be done in conformance with the 2024 Standard Specifications for Highways and Bridges, the 2017 Construction Standard Details, the Traffic Management Plans and Detail Drawings, MassDOT Work Zone Safety Temporary Traffic Control, the 1990 Standard Drawings for Signs and Supports; the 2015 Overhead Signal Structure and Foundation Standard Drawings, the 2009 Manual on Uniform Traffic Control Devices (MUTCD) with Revisions 1, 2, and 3 and the November 2022 Massachusetts Amendments to the MUTCD; the 1968 Standard Drawings for Traffic Signals and Highway Lighting; The American Standard for Nursery Stock; the Plans and these Special Provisions. The General Conditions, Supplementary Conditions and Special Provisions shall take precedence over the General Requirements of Division I of the Standard Specifications.
Post-Bid
Roads / Highways
$575,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 17, 2024
August 16, 2024
North St, Grafton, MA
Related To This Project
Grafton, MA
Bid Date: Aug 16 2024
Grafton, MA
Bid Date: Aug 30 2024
Grafton, MA
Bid Date: Jun 09 2021
Grafton, MA
Bid Date: Feb 04 2025
Grafton, MA
Bid Date: Dec 19 2024
Grafton, MA
Bid Date: Jun 04 2020
Grafton, MA
Bid Date: Jan 09 2025
Grafton, MA
Bid Date: Jul 08 2024
Grafton, MA
Bid Date: Jul 09 2024
Grafton, MA
Bid Date: Jun 25 2024
Grafton, MA
--
Grafton, MA
--
Grafton, MA
Bid Date: Nov 01 2018
Grafton, MA
Bid Date: Oct 18 2018
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
