BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Grafton, Massachusetts. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

North Street Pedestian Improvements. Work includes: the construction of new concrete pedestrian curb ramps, hot mix asphalt driveways and sidewalk, granite curb, minor drainage alterations, tree removal and protection, removal and resetting of stone walls, pavement markings and other incidental work. Contractor Qualification Highway Division Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. The work under this Contract consists of constructing pedestrian improvements, including new sidewalk and pedestrian curb ramps, along one side of North Street in Grafton. The project limits are from the existing sidewalk on Stonegate Circle to the intersection of Old Westboro Road and North Street. The work includes the construction of new cement concrete pedestrian curb ramps and sidewalk, hot mix asphalt driveways, granite curb, minor drainage alterations, tree removal and protection, removal and resetting of stone walls, pavement markings and other incidental work. All work under this Contract shall be done in conformance with the 2024 Standard Specifications for Highways and Bridges, the 2017 Construction Standard Details, the Traffic Management Plans and Detail Drawings, MassDOT Work Zone Safety Temporary Traffic Control, the 1990 Standard Drawings for Signs and Supports; the 2015 Overhead Signal Structure and Foundation Standard Drawings, the 2009 Manual on Uniform Traffic Control Devices (MUTCD) with Revisions 1, 2, and 3 and the November 2022 Massachusetts Amendments to the MUTCD; the 1968 Standard Drawings for Traffic Signals and Highway Lighting; The American Standard for Nursery Stock; the Plans and these Special Provisions. The General Conditions, Supplementary Conditions and Special Provisions shall take precedence over the General Requirements of Division I of the Standard Specifications.

Post-Bid

Roads / Highways

$575,000.00

Public - City

Paving, Site Work

25

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
368
Active Projects
171
Bidding Soon
3,184
All Active Projects
1,292
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 17, 2024

August 16, 2024

img_map_placeholder

North St, Grafton, MA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.