BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Bowmanville, Ontario. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The Municipality of Clarington (Municipality) is seeking a qualified Contractor to complete the construction of Phase 3 of the Soper Creek Trail located in the Soper Creek valley, east of Sprucewood Crescent, north of the existing Phase 2 trail, and south of Cotton Street in Bowmanville. All work is to be completed in accordance with the terms, conditions and specifications contained within the tender document. The scope of works includes: - Construction of the Soper Creek Trail from the Phase 2 terminus to Cotton Street including clearing / grubbing, earthworks, culvert installation, retaining wall installation, implementation of trail base and asphalt paving, installation of a pedestrian gates, chain link fencing, benches, sidewalk, tree planting, and general boulevard and area restoration. The work is located in Bowmanville within the Municipality of Clarington at the following location: - Soper Creek Trail located in the Soper Creek valley, east of Sprucewood Crescent, north of the existing Phase 2 trail, and south of Cotton Street in Bowmanville Documents can be obtained at: https://clarington.bidsandtenders.ca Question Deadline: Tue Jul 2, 2024 2:00:00 PM (EDT) Award subject to final approval

Award

Sidewalks / Parking Lot

$436,343.00

Public - City

Paving, Site Work

16

13

4

6

Subscribe For Documents

69 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
195
Active Projects
115
Bidding Soon
2,379
All Active Projects
960
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 9, 2024

August 5, 2024

img_map_placeholder

Cotton St, Bowmanville, ON


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.