BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 5, 2024 at 8:00 PM

Updated August 6, 2024

Site work and paving for a bridge / tunnel in Platte City, Missouri. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

On the Interurban Road Bridge crossing the Platte River, replace north and south bridge approach slabs which shall include but not be limited to furnishing all materials, labor and excavation necessary. Surface cracks in the substructure shall be pressure injected with epoxy including all materials and labor. Maintenance of ten feet on each bridge girder end shall include but not be limited to power washing and grinding of loose scale at abutment faces and applying primer and paint suitable for coating weathering steel. Primer and paint will be supplied by Platte County A certified or cashiers check or a bid bond in the amount of 10% shall be submitted with each proposal. The Platte County Commission reserves the right to reject any and all bids. A DBE Goal has not been established for this project, but the contractors are encouraged to seek DBE participation. No second tier subcontracting will be allowed in this project. The project will be awarded to the lowest, responsive, responsible bidder. MODOT - Interurban Road Bridge Maintenance

Bid Results

Bridges / Tunnels

$177,865.00

Public - County

Paving, Site Work

14

7

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
177
Active Projects
99
Bidding Soon
1,220
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 12, 2024

August 12, 2024

Project location map

Multiple Locations, Platte City, MO


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.