EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 11, 2024 at 8:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in St Charles, Illinois. Completed plans call for site work for a playground / park / athletic field; for paving for a playground / park / athletic field; road / highway; road / highway; and playground / park / athletic field.

Work generally includes asphalt paving patch, sports netting installation, and lawn restoration. Specifications require the submittal of a 10% Bid Surety with the proposal. In addition, the successful contractor(s) must be able to provide a satisfactory Performance Bond, Labor and Material Payment Bond, and required proof of insurance following the award of a contract. All contracts for work herein are subject to all City rules and regulations, and providing for the payment of Kane County's prevailing wage rate to all workers involved in these projects All bids will remain firm for 60 days after the bid opening. The St. Charles Park District reserves the right to reject any or all bids, to waive informalities on a bid, and to accept the lowest responsible bid that serves the best interests of the Park District. All inquiries, outside of the pre-bid meeting (if one is held), that concern the bid request shall be submitted in writing to Upland Design Ltd. via email to info@uplandDesign.com and gburkard@uplandDesign.com.

Post-Bid

Playgrounds / Parks / Athletic Fields

$30,000.00

Public - City

Paving, Site Work

6

10

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Shop Drawings, Product Data, and Samples, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Progress Cleaning
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Excavation and Fill, Excavation, Fill, Backfill, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
190
Active Projects
126
Bidding Soon
2,387
All Active Projects
995
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 10, 2024

August 9, 2024

img_map_placeholder

3565 Legacy Blvd, St Charles, IL

Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

East Side Sports Complex Netting

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.