BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 27, 2024 at 8:00 PM

Updated August 28, 2024

Site work, paving and outdoor lighting for a mixed-use development in St Charles, Illinois. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; sidewalk / parking lot; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The Project includes the following Work: Construction of an asphalt parking lot expansion of approximately 6000 square feet and installation of approximately700 feet of security fence around the property. Project will include striping, curb and gutter, lighting, concrete sign foundations, sidewalk, and detention basin upgrades/naturalization. Questions are encouraged to be sent to the project contact above and will be answered through addenda or direct response to all Plan Holders. The deadline for questions prior to the bid opening is: Deadline for Questions: 7/29/2024 If you need further information, please contact Anthony Bryant at abryant@wbkengineering.com or 630-885-9385. A satisfactory Bid Bond executed by the Bidder and an acceptable surety in an amount equal to five percent (5%)of the total Base Bid for the Divisions bid shall be submitted with each Bid.

Award

Sidewalks / Parking Lot

$265,320.00

Public - City

Outdoor Lighting, Paving, Site Work

18

34

2

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
479
Active Projects
258
Bidding Soon
3,527
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 1, 2024

September 2, 2024

Project location map

3823 Karl Madsen Dr, St Charles, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.