BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in Page, Arizona. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The amount programmed for this contract is $ 6,851,000. The location and description of the proposed work are as follows: The project will take place along Highway 89 (US 89) between approximately MP 548.45 and MP 548.63 in the town of Page, Coconino County, Arizona near the intersection of US 89 and Lake Powell Boulevard/Scenic View Road. The work consists of removing existing roadways and intersection and installing a one lane roundabout with lighting, sidewalks, as well as other related work. All work will take place within existing ADOT Right-of-Way (ROW) and within private lands in Temporary Construction Easement(s) (TCE's) along Scenic View Road, as well as within new permanent ROW from private landowners at the northwestern and southwestern segments of the intersection The time allowed for the completion of the work included in this contract will be 145 working days. Pre-Qualification: Yes The Application for Contractor Prequalification may be obtained from the Contracts and Specifications website. A proposal guaranty in the form of either a certified or a cashier's check made payable to the State Treasurer of Arizona for not less than 10 percent of the amount of the bid or in the form of a surety (bid) bond for 10 percent of the amount of the bid shall accompany the proposal. Bids will be received until the hour indicated and then publicly opened and read. No bids will be received after the time specified. Question Deadline 07/16/2024 Prior to the bid opening date, any questions pertaining to the plans, specifications, and bid schedule for this project shall be submitted to the Department in a written format through the Online. The Department may not answer all questions, and any decision on whether a question is answered will be within the sole discretion of the Department. Any questions received less than three working days prior to the bid opening date may not be answered. AZDOT - Install a Roundabout at the Intersection of US 89

Award

Roads / Highways

$4,718,804.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

95

6

26

7

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
3
Active Projects
2
Bidding Soon
24
All Active Projects
15
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 2, 2024

October 1, 2024

img_map_placeholder

Us 89 & N. Lake Powell Blvd, Page, AZ

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.