BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 29, 2024 at 8:00 PM

Updated July 30, 2024

Site work for a road / highway in Spooner, Wisconsin. Completed plans call for site work for a road / highway.

As of July 29, 2024. Project is awarded to Sherwin Industries but awarded amount is not available. Hot Applied Joint Sealant Bidders wishing to submit their bid by mail may do so at their own risk. Bids received through mail by the Washburn County Highway Department, later than the time set forth above will be returned unopened. The correct mailing address is Washburn County Highway Department, 1600 County Highway H, Spooner, WI 54801. The County reserves the right to accept or reject any or all bids, to waive any technicalities, and to select the bid proposal deemed most advantageous to the Washburn County Highway Department. Question Deadline 07/01/2024 Every request for such interpretation should be in writing and addressed to: Washburn County Highway Commissioner, 1600 County Highway H Spooner, WI 54801 or e-mail bdaniels@co.washburn.wi.us. To be given consideration, a request for interpretation must be received at least seven (7) days prior to the date fixed for the review of the qualifications packages. Hot Applied Sealant 45,000 pounds (or one truck load): a. The first type shall be single component, elastically modified composition of asphalt cement, virgin synthetic rubber, and other modifiers. b. This material will be used in a hot-oil jacketed melter (Crafco E-Z Pour 400). c. Comparable products are Craftco's Roadsaver 201 NB. d. The material must be capable of cooling and re-heating in the Pour Pot. e. Product specified must meet the requirements of ASTM D6690 type II and have these similar properties: Cone Penetration @ 77oF ASTM-D5329 90 dmm max Flow @ 140oF ASTM- D5329 3mm max. Resilience ASTM-D5329 60% min. Softening Point ASTM-D36 176oF min. Bond @ -20oF 50% max Asphalt Compatibility ASTM-D5329 Pass Rec. Application Temp. ASTM-5167 380o-400oF f. Material shall weigh a maximum of 50 pounds per package. g. Material contained in each boxless package shall be wrapped in a quick melt liner, which is dissolved and incorporated into the melted product. 2. Hot Applied Sealant 45,000 pounds (or one truck load): a. The second type shall be single component, elastically modified composition of asphalt cement, virgin synthetic rubber, and other modifiers. b. This material will be used in a hot-oil jacketed melter (Crafco E-Z Pour 400). c. Comparable products are Craftco's Roadsaver 231 NB. d. The material must be capable of cooling and re-heating in the Pour Pot. e. Product specified must meet the requirements of ASTM D6690 type IV and have these similar properties: Cone Penetration @ 77oF ASTM-D5329 90 - 150 dmm Flow @ 140oF ASTM- D5329 3mm max. Resilience ASTM-D5329 60% min. Softening Point ASTM-D36 176oF min. Bond @ -20oF 200% max Asphalt Compatibility ASTM-D5329 Pass Rec. Application Temp. ASTM-5167 380o-400oF f. Material shall weigh a maximum of 50 pounds per package. g. Material contained in each package shall be wrapped in a quick melt liner, which is dissolved and incorporated into the melted product.

Award

Roads / Highways

$135,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
203
Active Projects
113
Bidding Soon
1,244
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 8, 2024

August 7, 2024

Project location map

Multiple Locations, Spooner, WI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.