Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a municipal facility in Pilot Mountain, North Carolina. Completed plans call for the renovation of a municipal facility.
Improvements to the Armfield Civic and Recreation Center including pool renovations, gym renovations, pickle ball court installation, corn hole installation and other related site improvements. Contact Person for Questions: Michael Boaz Town Manager RFQ Questions May 10, 2024 All questions on RFQ should be sent in writing via e-mail to: mboaz@pilotmountainnc.org The Town of Pilot Mountain ("Town") is issuing this Request for Qualifications ("RFQ") for Construction Manager at Risk (CMAR) to provide Pre-Construction Services and Construction Services for the ACC 2024 PARTF Project project, including all site work, infrastructure, and park construction. The purpose of this solicitation is to provide a timely, cost-effective, and efficient project delivery method as authorized under N.C. General Statutes Section 143-64.31. Preliminary estimates of construction costs for Phase 1 are in the $900,000 range. The Town reserves the right to select the firm providing the best benefit to the Town. The Town reserves the right to obtain clarifications or additional information from any Proposer regarding its submission to this RFQ. All Proposers that submit to this RFQ will be notified of the final selection decision. The initial phase of work is to provide pre-construction services through the design and bid process, including but not limited to: 1. Collaborate with Town and the design team to develop the project 2. Attend regularly scheduled meetings with the design team to advise on matters related to material selection, building methods, construction details, phasing, sequencing, quality risks, and other applicable matters. 3. Review 30% design documents, cost estimates, and project schedule and identify key projectissues. 4. Prepare cost estimates at specific phases of design, including Construction Documents (30%, 60% and 90%) and Final Construction Documents (100%). The CMAR cost model shall be independent of the design team statement of probable construction costs and any other cost estimates provided to the Owner. 5. Conduct constructability review throughout the Pre-Construction phase and make recommendations for cost effective or value-added measures. 6. Develop a Critical Path Method schedule indicating methods and sequencing of procurement, permitting, regulatory approvals, staging, construction, and closeout. 7. Update project schedules and monitor adherence throughout the duration of the project. 8. In conjunction with the design team, prepare and submit all required permits and approvals. 9. Develop the schedule and manage the bidding process, preparing bid packages, prequalifying subcontractors, advertising, and coordinating the review and analysis of bids for subcontractor packages. All steps of the bidding process must be conducted in compliance with applicable local, state, and federal laws. 10. Deliver a Guaranteed Maximum Price (GMP) that includes the cost of the work based on the sum of bid amounts and the construction managers fee, general conditions, and contingency.
Post-Bid
Municipal
$900,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 24, 2024
August 23, 2024
873 W 52 Bypass, Pilot Mountain, NC
Related To This Project
Pilot Mountain, NC
Bid Date: Sep 10 2024
Pilot Mountain, NC
Bid Date: Mar 21 2024
Pilot Mountain, NC
Bid Date: Feb 23 2024
Pilot Mountain, NC
Bid Date: Nov 21 2023
Garner, NC
Bid Date: Aug 07 2024
Garner, NC
Bid Date: Aug 12 2024
Charlotte, NC
Bid Date: Jul 16 2024
Kannapolis, NC
--
Morganton, NC
Bid Date: Jul 23 2024
Lexington, NC
Bid Date: Jul 10 2024
Mebane, NC
Bid Date: Jul 08 2024
New Bern, NC
Bid Date: Aug 23 2024
Robbinsville, NC
Bid Date: Jul 02 2024
Durham, NC
Bid Date: Jul 29 2024
Fuquay Varina, NC
Bid Date: Jul 25 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.