Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 4, 2025 at 8:00 PM
Updated June 5, 2025
Demolition and site work for a transportation facility in Hagerstown, Maryland. Completed plans call for the demolition of a transportation facility; and for site work for a transportation facility.
Question Deadline 04/30/2025 at 4:00 PM ET This item of work shall consist of, but is not limited to, work and operations necessary for the movement of personnel, equipment, material and supplies to and from the project site for work on the project except as provided in the contract as separate pay items. The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE: UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio. The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate. A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the collective bargaining agreements on which the rate is based. Maryland as OWNER in the penal sum of (five percent (5%) of Total Bid) for the payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, successors and assigns. Scope of Work The Abatement Contractor has the responsibility for determining actual quantities of materials to be removed and reviewing the scope of work; the values described below are for budgetary purposes and may not accurately reflect the values encountered in the field. The contactor shall provide lump sum costs for abatement of the ACMs at the quantities identified in the table above, (section 1.1). Unit rates shall also be provided for each of the noted materials to be abated and for each of the materials identified in other areas of the building in the event that values greater than those anticipated are encountered during site work. Unit rates should also be provided for the noted presumed materials in the event that they are encountered during work. Work Included A. The work includes the furnishing of all labor, materials, equipment, insurance and services necessary for the completion of asbestos removal and related work. B. Comply with all governing regulations which this Plan supplements. C. Comply with applicable contract documents and any additional Washington County, MD, City of Hagerstown, MD, or Airport Design Consultants, Inc. Requirements.
Bid Results
Transportation Terminals
$2,997,800.00
Public - County
Demolition, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
