Published June 4, 2025 at 8:00 PM

Updated June 5, 2025

Demolition and site work for a transportation facility in Hagerstown, Maryland. Completed plans call for the demolition of a transportation facility; and for site work for a transportation facility.

Question Deadline 04/30/2025 at 4:00 PM ET This item of work shall consist of, but is not limited to, work and operations necessary for the movement of personnel, equipment, material and supplies to and from the project site for work on the project except as provided in the contract as separate pay items. The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE: UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio. The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate. A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the collective bargaining agreements on which the rate is based. Maryland as OWNER in the penal sum of (five percent (5%) of Total Bid) for the payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, successors and assigns. Scope of Work The Abatement Contractor has the responsibility for determining actual quantities of materials to be removed and reviewing the scope of work; the values described below are for budgetary purposes and may not accurately reflect the values encountered in the field. The contactor shall provide lump sum costs for abatement of the ACMs at the quantities identified in the table above, (section 1.1). Unit rates shall also be provided for each of the noted materials to be abated and for each of the materials identified in other areas of the building in the event that values greater than those anticipated are encountered during site work. Unit rates should also be provided for the noted presumed materials in the event that they are encountered during work. Work Included A. The work includes the furnishing of all labor, materials, equipment, insurance and services necessary for the completion of asbestos removal and related work. B. Comply with all governing regulations which this Plan supplements. C. Comply with applicable contract documents and any additional Washington County, MD, City of Hagerstown, MD, or Airport Design Consultants, Inc. Requirements.

Bid Results

Transportation Terminals

$2,997,800.00

Public - County

Demolition, Site Work

50

22

16

3

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
3
Bidding Soon
1,639
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 28, 2025

June 27, 2025

Project location map

18434 Showalter Rd, Hagerstown, MD

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.