BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 15, 2024 at 8:00 PM

Updated July 16, 2024

Site work and paving for a road / highway in Bloomville, Ohio. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Paving project totaling approximately 3 miles. ROSS RD Estimate for the improvement of Ross Rd with Asphalt Base and Asphalt Concrete. Beginning at the intersection of Carey Rd, thence going in a northerly direction 1.002 miles and terminating at the intersection of Orr Rd. Asphalt Concrete with Asphalt Concrete Base course 6.00”x2.75’ Length: 5,291 Feet 1.002 miles Width: 13.0 Feet Average Depth: 1.50 Inches (2 courses required) *Two courses required for leveling and crown definition (total depth: 1.5”) SWABB RD. Estimate for the improvement of Swabb Rd with Asphalt Concrete. Beginning at the intersection of Kessler Rd, thence going in a northerly direction 2.003 miles And terminating at the intersection of Orr Road. Asphalt Concrete Length: 10,576 Feet 2.003 Miles Width 11 Feet Average Depth: .75 Inches The right is reserved to reject any or all proposals, to waive informalities, or to accept any proposal that is deemed most favorable to Chatfield Township.

Award

Roads / Highways

$194,203.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
247
Active Projects
118
Bidding Soon
2,095
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 9, 2024

August 8, 2024

Project location map

Multiple Locations, Bloomville, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.