Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Marietta, Georgia. Completed plans call for site work for a road / highway; and for paving for a road / highway.
6.146 Miles of Milling, Inlay and Plant Mix Resurfacing on I-285/sr 407 Beginning South of Paces Ferry Rd and Extending West of Long Island Dr. Counties : Cobb, Fulton District 7 - Chamblee, Area Office 2 - Marietta Question Deadline - 07/05/2024 at 11:00 AM ET The Department is Moving to Limit the Posting of Amendments for Advertised Contracts to the Close of Business of the Friday the Week Before the Letting. In Order to Accomplish This, All Questions and Comments Must Be Submitted by the Close of Business of the Friday Two Weeks Before the Letting. All questions and comments received after the Friday before the week of the Letting will be documented, but a response will not be provided. For Those Contractors Who Are Currently Prequalified as a Gdot Construction Prequalified Contractor or Registered Subcontractor Through Gdot's Construction Bidding Administration Office, and Want to Be Prequalified to Perform Maintenance Projects Under the Routine Maintenance Services Program, There is Now a Modified Prime Contractors Application Form Available. We Welcome You to Participate. The Application Form and All Applicable Documents, Resources and Other Guidance May Be Found on the Gdot Website. Proposals Shall Only Be Submitted Electronically as Specified in the Specifications; and Shall Be Accompanied by a Proposal Guaranty in the Indicated Amount in the Form of a Certified Check, Cashiers Check or Bid Bond on the Form Issued by the Department. This Advertisement is Merely an Invitation for the Submission of Bids Which Will Be Considered as Offers for Performance of Work by the Submitting Party. The State Reserves the Right to Reject Any or All Bids. The Surety for Bid Bonds and Performance and Payment Bonds Shall Be a Company Acceptable as Surety on Federal Bonds and Listed in the Current Federal Register and Licensed in the State of Georgia. For Any Related Issues, Please Contact the Following Individual: Kimberly King 404-631-1972 Should You Have Questions or Need Assistance, Contact William Dunwoody at 404-631-1147. Should You Have Questions or Need Assistance, Contact the Office of Construction Bidding Administration at 404-631-1147 Questions or Comments Call (404) 631-1147 Quantities Shown Herein Are for Information Only and Should Not Be Used for Bidding Purposes. The Department Reserves the Right to Change These Quantities Without Notice. GADOT - 023 - Milling, Inlay and Plant Mix Resurfacing on I-285/SR 407 This section, as supplemented by the Plans, Specifications, and Manual on Uniform Traffic Control Devices (MUTCD) shall be considered the Temporary Traffic Control (TTC) Plan in accordance with Work Zone Safety and Mobility Policy. Activities shall consist of furnishing, installing, maintaining, and removing necessary traffic signs, pedestrian signs, barricades, lights, signals, cones, pavement markings and other traffic control devices and shall include flagging and other means for guidance and protection of vehicular and pedestrian traffic through the Work Zone. This Work shall include both maintaining existing devices and installing additional devices as necessary in construction work zones. The Contractor shall be responsible for the maintenance of traffic signals and Advanced Traffic Management System (ATMs) devices from the time that the system is modified until final acceptance. The maintenance of traffic signals and ATMs devices that are not a part of the Work and that are not in conflict with any portion of the Work shall not be the responsibility of the Contractor. However, the Contractor is still responsible for damages to all devices that they or their subcontractors cause, in accordance with Section 107 and other Specifications. When any provisions of this Specification or the Plans do not meet the minimum requirements of the MUTCD. the MU TCP shall control. The 2023 Edition of the MU TCP including revisions shall be in effect for the duration of the project. All traffic control devices used during the construction of the project shall meet the standards utilized in the MU TCP, and shall comply with the requirements of these Specifications, Georgia Construction Standards and Details, Project Plans, Design Manuals, and Special Provisions. The needs and control of all road users (motorists, bicyclists and pedestrians within the highway right-of-way and easements, including persons with disabilities in accordance with the Americans with Disabilities Act of 1990 (ADA), Title II,) through a Temporary Traffic Control (TTC) zone shall be an essential part of highway construction, utility work, maintenance operations and management of traffic incidents. Utilities included in the Contract are bound by Special Provision 150 and shall follow its requirements. For utilities not included in the Contract but working within the project limits, they shall, at a minimum follow the MUTCD. Moreover, in accordance with Utility Accommodation Policy and Standards Manual dated 2016, the Engineer reserves the right to require additional certified flaggers, signs, warning lights, channelization devices, and other safety devices as may be necessary to properly protect, warn, and safeguard the traveling public. In addition, the Department reserves the right to place time restrictions or moratoriums on all utility work covered under a permit when, in the opinion of the Department, the continuance of the Work would seriously hinder traffic flow, be needlessly disruptive, or would unnecessarily inconvenience the traveling public. In case of emergencies, Utilities shall be provided access in accordance with Utility Accommodation Pojicy and Standards Manual.
Bid Results
Roads / Highways
$29,884,696.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 19, 2024
September 17, 2024
I-285 & SR-407, Marietta, GA
Related To This Project
Marietta, GA
Bid Date: Sep 04 2024
Marietta, GA
Bid Date: Sep 13 2024
Marietta, GA
--
Marietta, GA
Bid Date: Jul 15 2024
Marietta, GA
Bid Date: Jul 11 2024
Marietta, GA
Bid Date: Sep 06 2024
Marietta, GA
Bid Date: Aug 08 2024
Marietta, GA
Bid Date: Aug 08 2024
Marietta, GA
Bid Date: Jul 19 2024
Marietta, GA
Bid Date: Jul 25 2024
Marietta, GA
Bid Date: Jun 24 2024
Marietta, GA
Bid Date: Aug 08 2024
Marietta, GA
--
Marietta, GA
Bid Date: Jul 11 2024
Marietta, GA
Bid Date: Jul 15 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.