Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work and new construction of a bridge / tunnel in Lincolnshire, Illinois. Working plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; and for site work for a bridge / tunnel.
As of August 1, 2024, project was rejected, they will rebid it next year. The proposed project consists of removal of the existing concrete aprons and double-barrel, reinforced concrete box culverts (out-to-out length of 16'-6' and out-out width of 13'-10') and replacement with a single-cell, cast-in-place (CIP) reinforced concrete box culvert spanning 13'-0" with a rise of 1'-8". The proposed structure has an out-to-out length of 24'-9 3/4 ", an out-out width of 14'-0' and a clear width of 10'-2" (face-to-face) of parapets. The proposed structure also includes steel parapet railing, stenciled Portland cement concrete decking and concrete parapets with textured form liner surfaces and stained concrete. The approach brick path will be removed and reinstalled with a concrete edge restraint, including the placement of subbase granular material and geotechnical fabric, the removal and disposal of unsuitable material beneath the culvert and material replacement with rock fill. Work also includes stump removal, installation of stone outcropping, placement of sediment and erosion control measures, traffic control signage and stone riprap, landscaping and site restoration All Contracts for Public Works are subject to the Illinois Prevailing Wage Act (820 ILCS 130/1-12) and the Employment of Illinois Workers on Public Works Act (30 ILCS 570). The Village of Lincolnshire reserves the right to defer the acceptance of a proposal for a period not to exceed 90 calendar days after the date proposals are received and to accept or reject all proposals and to waive technicalities and to accept the proposal which best meets the needs and requirements of the municipalities as outlined in the Request for Proposals. The work consists of removal of the existing concrete aprons and double-barrel, reinforced concrete box culverts (out-to-out length of 16'-6' and out-out width of 13'-10') and replacement with a single-cell, cast-in-place (CIP) reinforced concrete box culvert spanning 13'-0" with a rise of 1'-8". The proposed structure has an out-to-out length of 24'-9 3/4 ", an out-out width of 14'-0' and a clear width of 10'-2" (face-to-face) of parapets. The proposed structure also includes steel parapet railing, stenciled Portland cement concrete decking and concrete parapets with textured form liner surfaces and stained concrete. The approach brick path will be removed and reinstalled with a concrete edge restraint, including the placement of subbase granular material and geotechnical fabric, the removal and disposal of unsuitable material beneath the culvert and material replacement with rock fill. Work also includes stump removal, installation of stone outcropping, placement of sediment and erosion control measures, traffic control signage and stone riprap, landscaping, site restoration and all incidental and collateral work necessary to complete the project as shown on the Plans and as described herein. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Budget is $200K to $250K
Final Planning
Bridges / Tunnels
$386,412.00
Public - City
Demolition, New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 11, 2024
February 3, 2025
49 Oxford Dr, Lincolnshire, IL
Related To This Project
Lincolnshire, IL
Bid Date: Jul 11 2024
Lincolnshire, IL
Bid Date: Aug 16 2024
Lincolnshire, IL
Bid Date: Aug 09 2024
Lincolnshire, IL
Bid Date: Aug 26 2024
Lincolnshire, IL
Bid Date: Aug 19 2024
Lincolnshire, IL
Bid Date: Oct 11 2024
Lincolnshire, IL
Bid Date: Oct 21 2024
Lincolnshire, IL
Bid Date: Oct 25 2024
Lincolnshire, IL
Bid Date: Jul 16 2024
Lincolnshire, IL
Bid Date: May 08 2024
Lincolnshire, IL
Bid Date: May 01 2024
Lincolnshire, IL
Bid Date: Apr 30 2024
Lincolnshire, IL
Bid Date: Mar 20 2024
Lincolnshire, IL
Bid Date: Mar 27 2024
Lincolnshire, IL
Bid Date: Mar 28 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.