Demolition, site work and new construction of a bridge / tunnel in Lincolnshire, Illinois. Working plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; and for site work for a bridge / tunnel.

As of August 1, 2024, project was rejected, they will rebid it next year. The proposed project consists of removal of the existing concrete aprons and double-barrel, reinforced concrete box culverts (out-to-out length of 16'-6' and out-out width of 13'-10') and replacement with a single-cell, cast-in-place (CIP) reinforced concrete box culvert spanning 13'-0" with a rise of 1'-8". The proposed structure has an out-to-out length of 24'-9 3/4 ", an out-out width of 14'-0' and a clear width of 10'-2" (face-to-face) of parapets. The proposed structure also includes steel parapet railing, stenciled Portland cement concrete decking and concrete parapets with textured form liner surfaces and stained concrete. The approach brick path will be removed and reinstalled with a concrete edge restraint, including the placement of subbase granular material and geotechnical fabric, the removal and disposal of unsuitable material beneath the culvert and material replacement with rock fill. Work also includes stump removal, installation of stone outcropping, placement of sediment and erosion control measures, traffic control signage and stone riprap, landscaping and site restoration All Contracts for Public Works are subject to the Illinois Prevailing Wage Act (820 ILCS 130/1-12) and the Employment of Illinois Workers on Public Works Act (30 ILCS 570). The Village of Lincolnshire reserves the right to defer the acceptance of a proposal for a period not to exceed 90 calendar days after the date proposals are received and to accept or reject all proposals and to waive technicalities and to accept the proposal which best meets the needs and requirements of the municipalities as outlined in the Request for Proposals. The work consists of removal of the existing concrete aprons and double-barrel, reinforced concrete box culverts (out-to-out length of 16'-6' and out-out width of 13'-10') and replacement with a single-cell, cast-in-place (CIP) reinforced concrete box culvert spanning 13'-0" with a rise of 1'-8". The proposed structure has an out-to-out length of 24'-9 3/4 ", an out-out width of 14'-0' and a clear width of 10'-2" (face-to-face) of parapets. The proposed structure also includes steel parapet railing, stenciled Portland cement concrete decking and concrete parapets with textured form liner surfaces and stained concrete. The approach brick path will be removed and reinstalled with a concrete edge restraint, including the placement of subbase granular material and geotechnical fabric, the removal and disposal of unsuitable material beneath the culvert and material replacement with rock fill. Work also includes stump removal, installation of stone outcropping, placement of sediment and erosion control measures, traffic control signage and stone riprap, landscaping, site restoration and all incidental and collateral work necessary to complete the project as shown on the Plans and as described herein. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Budget is $200K to $250K

Final Planning

Bridges / Tunnels

$386,412.00

Public - City

Demolition, New Construction, Site Work

28

5

6

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
185
Active Projects
100
Bidding Soon
2,016
All Active Projects
866
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 11, 2024

February 3, 2025

img_map_placeholder

49 Oxford Dr, Lincolnshire, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.