BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 17, 2024 at 8:00 PM

Updated October 18, 2024

Site work, paving and outdoor lighting for a mixed-use development in Murrieta, California. Completed plans call for site work for a 33,800-square-foot road / highway; for paving for a sidewalk / parking lot; road / highway; water / sewer project; sidewalk / parking lot; and for outdoor lighting for a road / highway.

Liquidated Damages 500 Estimated Bid Value 2310000 Start/Delivery Date November 1, 2024 Project Duration 50 Days The preparation, construction, and installation of a new parking lot; entryway monument at the corner of Jefferson Ave & Kalmia St; drainage improvements; lighting and electrical improvements; traffic signal control cabinet relocation (additive bid item); and landscape improvements. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Q&A Deadline 08/28/2024 10:00 AM (PDT) The work consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and Contract Documents for the above-stated project. 1. CONSTRUCTION OF NEW 33,800 SF AMPHITHEATER PARKING LOT NEAR MEMORIAL WAY AND TOWN SQUARE PARKWAY. SCOPE INCLUDES CIVIL, LANDSCAPING, DRAINAGE, LIGHTING, AND ADA WALKWAY IMPROVEMENTS. 2. PARKWAY LANDSCAPING ALONG KALMIA STREET. 3. CONSTRUCTION OF NEW ENTRY MONUMENT WITH LANDSCAPING AT KALMIA STREET AND JEFFERSON AVENUE. SCOPE INCLUDES GRADING, ADA WALKWAY, STRUCTURAL DETAILS, LANDSCAPING, IRRIGATION AND LIGHTING IMPROVEME

Award

Sidewalks / Parking Lot

$2,345,755.00

Public - City

Outdoor Lighting, Paving, Site Work

54

9

4

5

Subscribe For Documents

50 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
599
Active Projects
299
Bidding Soon
3,965
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 12, 2024

November 11, 2024

Project location map

Jefferson Ave & Kalmia St, Murrieta, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.