EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 26, 2024 at 8:00 PM

Updated October 1, 2024

Site work and asbestos abatement for a retail development in Bisbee, Arizona. Completed plans call for site work for a retail development; and for asbestos abatement for a retail development.

The scope of work (SOW) for this project is to remove Regulated Building Material (RBM) including but not limited to asbestos-containing material (ACM) and lead-based paint from the former Bisbee Gourmet Foods, Co, located at 30 Main St, Bisbee, Arizona. The work will be performed by an asbestos abatement Contractor ("Contractor") under contract to City of Bisbee. The asbestos to be removed from the two-story commercial building includes the following The City reserves the right to waive any immaterial defect or informality in a Bid; to reject any or all Bids or portions thereof; to reissue this Notice of Solicitation; and to accept a Bid on a partial basis, if in the best interests of the City Optional Field-Meeting: Upon Request Inquiries may be directed to: City of Bisbee Public Works 76 Erie St Bisbee, AZ 85603 Attn: Matthew Gurney (520) 432-6002

Post-Bid

Retail

$66,000.00

Public - City

Asbestos Abatement, Site Work

5

5

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Tiling, Flooring, Carpeting
Division 10 - Specialties

Division 10 - Specialties

Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 26 - Electrical

Division 26 - Electrical

Facility Electrical Power Generating and Storing Equipment

Find More Local Projects

Within 75 Miles of This Project
12
Active Projects
5
Bidding Soon
87
All Active Projects
36
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 3, 2024

November 4, 2024

img_map_placeholder

30 Main St, Bisbee, AZ


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Abatement of Regulated Building Material (RBM)

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.