BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a transportation facility in Rockford, Illinois. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

Reference Number 0000355970 Job Location 60 Airport Drive Rockford, Illinois United States 61109 Question Deadline 07/02/2024 at 12:00 AM CT Questions are submitted online No. Participation Requirements - Minority Business Participation General Requirements - Contractors License Required - Federally Funded - FOB Destination - Installation Required - Insurance Required - Local Service Required - Prevailing Wage Required The Disadvantaged Business Enterprise (DBE) goal for the project has been established at 10%. The project work consists of the following major items and approximate quantities: Unclassified Excavation - 13,500 CY, Pavement Removal - 28,715 SY, Cold Milling - 9,500 SY, Crushed Aggregate Base Course 8" - 30,350 SY, Crushed Aggregate Base Course 14" - 1,250 SY, Asphalt Base Course - 9,100 TON, Asphalt Surface Course - 1,150 TON, 18" Cement Concrete Pavement - 30,050 SY, Perforated Underdrain - 3,920 LF, Adjust Elevated Taxiway Edge Light in Pavement - 28 EA, Airfield Lighting Cable - 800 LF, Concrete Encased Electrical Conduit - 700 LF, Pavement Marking - 27,500 SF, Seeding - 4.3 AC, Mulching - 4.3 AC. Bonding Requirements - Bid Bond 10 % - Performance Bond 100 %. A bid bond, cashier's check, or a certified check made payable to the order of the Chicago Rockford International Airport in the amount of ten percent (10%) of the total bid must be deposited by each bidder with his bid as guarantee that in case the contract is awarded to him, he will within fifteen (15) days thereafter, upon receipt of written notice of award, execute such contract and furnish a satisfactory performance bond. The successful bidder will be required to furnish performance bond satisfactory to the owner in the amount of the contract. Upon failure to do so, he shall forfeit the deposit as liquidated damages and acceptance of the bid will be contingent upon the fulfillment of this requirement by the bidder. * The owner reserves the right to waive or not to waive any irregularities in the bids and to reject any or all bids and to determine which is the lowest and best bid or combination of bids for the improvements.

Post-Bid

Transportation Terminals

$600,000.00

Public - City

Paving, Site Work

55

11

6

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
197
Active Projects
131
Bidding Soon
2,149
All Active Projects
931
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 23, 2024

August 23, 2024

img_map_placeholder

60 Airport Dr, Rockford, IL

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.