BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Arlington, Texas. Completed plans call for site work for a water / sewer project.

Question Deadline 06/28/2024 at 5:00 PM CT Deadline for Questions to be submitted on Procureware Questions will be answered on online Tuesday, July 2, 2024, 12:00 PM Over the last 10 years, the Joe Pool Lake watershed has experienced tremendous growth and conversion of pastureland to urban and suburban land uses. As the owner of all the water rights in Joe Pool Lake, the Authority is concerned about the impact of this rapid development on the lake's water quality. To address these concerns, in 2018, the Authority assembled a group of stakeholders with representatives from watershed residents, businesses, municipal and county staff, other public officials, and state/federal agency staff called the Joe Pool Lake Watershed Protection Partnership. Through this stakeholder engagement process, the Joe Pool Lake Watershed Protection Plan was developed. The EPA approved the Joe Pool Lake Watershed Protection Plan which addresses regionalscale, multi-jurisdictional water quality concerns, in October 2022. This Watershed Protection Plan recommended the implementation of watershed-specific, stakeholderdirected watershed protection measures to improve and protect the water quality in Joe Pool Lake. Currently, several water supply and wastewater operations are being considered that could potentially affect the water quality in Joe Pool Lake. These include the use of Joe Pool Lake as a terminal reservoir for water from the Tarrant Regional Water District's Integrated Pipeline (IPL) project. The source water for the IPL could be any combination of water from Richland Chambers, Cedar Creek, Lake Tawakoni, and eventually Lake Fork. With increased development comes the need for increased wastewater treatment facilities. The Authority's Mountain Creek Regional Wastewater Treatment Plant (MCRWS) is currently permitted at 4.5 million gallons per day (MGD) with an ultimate permit limit of 12 MGD. Several small (=1 MGD) wastewater treatment plants have been proposed or approved at TCEQ to treat these new developments and there is every reason to believe that this will continue to increase. These plants have historically resulted in poorer water quality treatment than regional facilities, causing the Authority to be concerned about their effect on Joe Pool Lake. Additionally, during the permitting process, TCEQ considers each permit on an individual basis, which is not appropriate in rapidly developing watersheds because of the cumulative effect on receiving streams.

Post-Bid

Water / Sewer

$400,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
356
Active Projects
209
Bidding Soon
4,896
All Active Projects
1,872
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.