Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 9, 2024 at 8:00 PM
Updated August 10, 2024
Site work for a water / sewer project in Butler, Pennsylvania. Completed plans call for site work for a water / sewer project.
For the following: IROQUOIS-CHEROKEE DRIVE STORMWATER kee Drive Storm water Improvement project will include replacement of an existing 24" CMP with a new 30" and 36" SLCPP, connection to wall and outlet protection, stream enclosure, site grading, resident notification, installation and removal of erosion and sediment controls, and site restoration ADD ALTERNATE #1 - GLENWOOD WAY STORMWATER IMPROVEMENTS The Glenwood Way Storm water Improvement project will include replacement of an existing 72" CMP with a 13' IO x 5'5" bottomless aluminum arch culvert with steel express footers and aluminum wing panels, road widening, mill and paving of existing road, installation of guiderail and end treatments, stream bypass, installation and removal of erosion and sediment controls, traffic control, and site restoration. ADD ALTERNATE #2 - LAKESHORE DRIVE STORMWATER IMPROVEMENTS The Lakeshore Drive Stormwater Improvement project will include replacement of an existing 24" CMP with two (2) parallel runs of 24 SLCPP across Lakeshore Drive, mill and paving of existing road, haad wall. And wall, installation and removal of erosion and sediment controls, traffic control, and site restoration.
Award
Water / Sewer
$107,775.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 16, 2024
August 16, 2024
Multiple Locations, Butler, PA
Related To This Project
Butler, PA
Bid Date: Jul 29 2024
Butler, PA
Bid Date: Aug 21 2024
Butler, PA
Bid Date: Aug 21 2024
Butler, PA
Bid Date: Aug 21 2024
Butler, PA
Bid Date: Aug 21 2024
Butler, PA
Bid Date: Aug 21 2024
Butler, PA
Bid Date: Aug 21 2024
Butler, PA
Bid Date: Jul 25 2024
Butler, PA
Bid Date: Jun 24 2024
Butler, PA
Bid Date: Jun 27 2024
Butler, PA
Bid Date: Jun 11 2024
Butler, PA
Bid Date: Jun 25 2024
Butler, PA
Bid Date: Jun 18 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
